Quotation Are Invited For Job1031902040 Main Steam ValvesStandard Terms Conditions1 Prices Should Be Ddp Delivery Duty Paid At Dewa Stores 2 Quotation To Be Submitted Only In Local Currency U A E Dirhams3 Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material4 No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company And Your Participation In Dewa Tenders Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest 1 Hrsg 4 Main Steam Valve Size 14Inch Class 2500 Butt Weld Qty 1No 2 Hrsg 4 Main Steam Non Return Valve Size 14Inch C Lass 1500 Butt Weld Qty 1No 3 Pipe Spool Piece Size 14Inch Pipe Thickness 55 6Mm 4 Insulation Cladding Removal Re Fixing Of The Job Facilities By Dewa 1 There Will Be One Dewa Engineer For Contractor Liaison And Will Support For Technical And Nontechnical Security A Registration Management Issues 2 Site Survey Spot Measurements Upon Request Of Pipes All Att Achments Is To Be Done By Suppliers 3 Dewa Engineers Shall Be Contacted At Any Time In Office Hours For Any Queries And Doubts And Case Of Urgent Any Time Beyond Office Hours Even During Holidays And Off Days 4 Required New Valves Pipe Fittings Fas Teners And Insulation Cladding Shall Be Provided By Dewa For Fabrication And Installation Shall Be Used As Per Actual Requirement Without Wastage The Requirement Of Material Shall Be Submitted 48 Hours In Advance Except The Items For Hydro Static Test 5 No Office Space Will Be Provided By Dewa On Application With Relevant Particulars Will Provide Suitable Place 6 Water Electricity And Compressed Air 7 Crane Forklift With Operator Shall Be Provided By Dewa As Required For The Work T Hese Requirements Shall Be Properly Planned And Requested For One Day In Advance In Writing However Any Delay In Providing These Facilities Due To Failure To Apply In Time Or Due To Short Period Few Hours Shall Not Be Reasons For Delay In Execu Tion Terms Conditions For Contractor 1 The Contractor Shall Provide Adequate Number Of Technical Qualified Staff And Super Visors On Site Having Minimum Of Five Years Prior Experience On Piping Job To Ensure Proper And Timely Completion Of Work 2 The Contractor Shall Also Nominate One Responsible Person As Project Engineer Who Shall Liaison With The Owner On All Mat Ters Pertaining To The Contract And Who Will Be Available At Site All Throughout The Working Hours 3 The Contractor Should Su Bmit The Bio Data The Engineer Technical Supervisors Quality Inspectors Safety Supervisor 4 Contractor Should Be Cert Ified As Asme U R Stamp 5 All Applicable Equipment And Tools Should Have Valid Test Certificate From 3Rd Party Licensed Certifying Agencies 6 Including All The Followings Shall Be Arranged By The Contractor As Part Of The Contract Work A Cu Tting Removal Of Existing Valve Pipe Line B Keep All Old Removed Pipe Line In Designated Area Ground Level C Colle Ction Of The Valves Pipes Fittings From Dewa Stores For Fabrication Work D Transportation And Delivery Of The Fabricated P Ipe Materials On Site E Welding Machines Welding Consumable Tools Tackles Etc Required For The Work F Hand And Po Wered Tools Rigging Tools Material Handling Facilities Alignment Jigs And Fixtures Inspection Tools And AccessoriesFor E Station Hrsg Main Steam Valves Pipe Line Replacement Dewa Contact Person Gopal Tewari 0508806977 Or Faisal 0553369592
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20919193
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.