Project Detail |
E&S CATEGORY tooltip
B
COUNTRY
Brazil
SECTOR
Energy
STATUS
Proposed
DISCLOSED DATE
02/06/2023
Projected date at which a project will be put forward for the Board of Executive Directors’ approval.
PROJECTED BOARD DATE tooltip
08/01/2023
APPROVAL DATE
N/A
SIGNED DATE
N/A
SPONSORING ENTITY
N/A
TEAM LEADER
Bianco del Barrio, Silvana
INVESTMENT TYPE
Loan
SYNDICATED AMOUNT
USD $ 49,000,000
FINANCING AMOUNT
USD $ 36,398,900
CURRENCY
BRL
The proposed operation consists of the design, construction, operation, and maintenance of the Usina Termelétrica Lençóis Paulista (“UTE Cidade do Livro”), an 80 megawatts (“MW”) Thermal Power Plant (“TPP”) fueled by biomass, using preferably wood chip or sugarcane bagasse, and a substation, as well as a 25-kilometer (“km”) long 138 kilovolts (“kV”) Transmission Line (“TL”) to connect the TPP to the Brazilian interconnected grid at the existing Barra Bonita Substation (“The Project”). The Project will be developed in the municipality of Lençóis Paulistas, São Paulo State, Brazil. The Project’s estimated CAPEX amounts up to BRL 590 million. |