Argentina Procurement News Notice - 36573


Procurement News Notice

PNN 36573
Work Detail The Government of the Province through the Ministry of Works and Public Services, will tender works in September for an amount greater than 3,665 million pesos for road construction, educational buildings, health and drinking water networks. Public works generate genuine sources of work and provide infrastructure to all localities in the Province for social, economic, educational, productive, security, education, connectivity and health development. The works to be tendered during September deal with improvements to provincial routes, renovation of drinking water networks and educational buildings. road conditions One of the works deals with the "Structural Reinforcement Construction on Provincial Route 101" between RN 188 and the town of Falucho with an execution term of 24 months and a budget of more than 1,000 million pesos. The Provincial Directorate of Roads responsible for the construction of RP 101 reported that the work involves the milling of the entire existing bearing layer to build the new granular bases, on which the new asphalt concrete bearing layer will materialize in hot with modified asphalt. The tasks consist of milling the existing bearing layer, construction of a 0.20 m thick granular base in a 7.50 m width, construction of a 0.15 m thick granular base in a 7.20 m width, irrigation of the primer of the base, irrigation of league, hot asphalt concrete layer 0.03 m thick, construction of shoulders, horizontal signaling, cleaning of sewers and pruning of copses. The purpose is to have the provincial routes in good traffic conditions to collaborate in the prevention of road accidents, provide security to the users of the road network and collaborate with production and economy. New Hospital for La Adela The new Hospital for La Adela has an official budget of $1,855,050,982 and a deadline for completion of 730 days, it is a public work of great magnitude for the town and the Province for the benefits it will provide to the inhabitants of the town and the region. It will have a total area of ??more than 5,000 square meters, including covered, semi-covered, eaves and pavement constructions. The building was designed with two parallel, main and articulating axes of the executive development, alternating functional use packages and interior patios with a roof that unifies them spatially and gives the complex a strong identity. In addition to the complex, health activities for independent use are annexed, through a private and specific connection axis, The health complex will be implanted in what is now a green space free of constructions with appropriate dimensions for its development, with a functional organization chart that covers the needs, developing the spaces through identifiable functional pavilions, independent with connection through two large circulatory links, one for access and circulation of the public and patients and another for the circulation of technicians and professionals who work with specific materials that must be safeguarded to comply with health regulations and prevention. The construction system will be the traditional rationalized one, on an independent structure, with upper enclosures in flat reinforced concrete slabs, in circulations and services. On the other hand, metal roof sloping roof in naves and pavilions. The interior flooring of granite mosaics in the vast majority of the premises and specific flooring for critical emergency areas. Machine-polished reinforced concrete will be used for the service premises and machine rooms. The carpentry will be made of folded sheet metal for exterior access doors, windows and interior balcony doors in colored aluminum and interior sheets of laminate-veneered plate-type doors, as well as the fixed furniture. For the infrastructure installations, they will be connected to the concessioned public services, electricity, natural gas and sanitation, which will serve the different interior spaces, as well as the thermomechanical and filtered air installations, adding the medical gas service. The exterior spaces will be treated with washed stone mosaic plates and a perimeter cordon for closure and confinement in simple concrete. The access streets, services and parking lots will have concrete floors. Potable water for Caleufú, Villa Mirasol and Arata. In the towns of Caleufú, Villa Mirasol and Arata, the drinking water networks will be renewed to ensure quality and supply in homes, businesses and companies. From the Provincial Water Administration, surveys and studies were carried out that determined the need for the renovation of pipes, the projects have been designed to cover the needs of the population with a 20-year projection. The main objective, in the three locations, is to replace the obsolete and insufficient diameter pipes that make up the existing networks, to improve the supply of drinking water that will impact service provision, guaranteeing adequate flows and pressures at each point of consumption. The execution of the works in each of these towns foresees the hiring of local labor. In Caleufú, it is planned to begin the second stage of the Renewal of the Potable Water Network, the work has an official budget of $251,309,015 and a term of 360 days. It includes the placement of 13,566 meters of pipes for home installation and 5,760 meters for the replacement of the existing supply drive, 10 hydrants in the urban area in case of fire, 516 home installations with meter, restitution of gutter cords, speed bumps, expansion wide runoff of water and asphalt. The work to be carried out includes searches, sidewalks, pavements, excavations, bilge tasks, filling and compaction, construction cleaning, signaling, fencing and security measures. It also foresees the connection to the lowering of the reserve tank, to the cistern and to the existing impulsion. Meanwhile, in Villa Mirasol, the second Stage of Adaptation of the Potable Water Distribution Network will be tendered, with an official budget of $63,032,797 and a delivery period of 120 days. The purpose of the work is to continue with the renovation and expansion of networks that began in 2021 in various sectors of the urban fabric. Its main objective is to replace the obsolete and insufficient diameter pipes that make up the existing network. In this stage, 6,013 meters of pipes will be placed, also replacing one of the drops of the elevated tank. The system will be linked to 185 home connections and 11 hydrants will be installed for fire protection. The project includes the repair of sidewalks and pavements that are affected by the development of the work. The “Renewal of Potable Water in Arata” work, has a budget of $159,825,182 and an execution period of 300 days, consists of replacing obsolete pipes with insufficient diameter for the existing distribution network. It includes the placement of 11,944 meters of PVC pipes of 63 mm, 75 mm, 90 mm, 110 mm and 160 mm in diameter. 412 home connections will be linked and 8 hydrants will be installed at different points in the urban area, for fire protection. In addition, the work to be carried out includes the repair of sidewalks, speed bumps, gutter cord and pavement that are intervened. Local labor is expected to be hired for the works. Works for Education With a budget of $235 million, the New Speluzzi Secondary School Building will be tendered, which will have a total area of ??1,321.50 m2 and a delivery time of 365 days. The building is proposed with a strong linear imprint with a circulation that defines a double bay. The access is resolved on a central point that is the distribution hall. Said enclosure connects, on the one hand, the classrooms, restrooms and government area, on the other hand, the special classrooms and the support sectors to the multipurpose room. The hall, in turn, acts as a link between the street and the schoolyard. A mixed traditional construction system is proposed, in restrooms and the government area, hollow brick masonry of different sizes, covered with a metal structure, is used. In the hall, zenithal light is provided through a break in the roof, the carpentry is made of white anodized aluminum and only the entrance doors and emergency exits have doubled sheet metal carpentry with anticorrosive treatment and paint with a wrought iron effect. In all cases, the glass to be used will be laminated safety, parasols are projected as solar protection screens on carpentry of common and special classrooms, government area and teachers room. The ceilings are different according to the characteristics of each environment. The interior floors in gray granite mosaics; In patios, accesses and exterior perimeter sidewalks, precast tiles will be used. Non-slip granite mosaic will go in the sidewalk sectors. In the humid cores, coatings are projected up to the height of the ceiling. In the living room kitchen, laboratories and office, the countertops are granite. In the area of ??sinks for student toilets, a design of countertops with concrete pieces and a lining plinth simulating a monolithic piece, which houses the stainless steel sinks, is proposed. The electrical installation, sewage system, water and gas will be carried out with high quality materials in accordance with current regulations for this type of building. The air conditioning of the building will be with central heating equipment by injection of hot air through sheet metal ducts. The fire safety system will be resolved by placing fire extinguishers as established by the competent authorities. Another of the tenders for education is for the "Repair and expansion of Comprehensive School No. 30 of Embajador Martini" whose budget is $ 67,896,759 and the work term of 150 days. The work is related to repair work on roof decks, interior ceiling joints, installation and electrical appliances, exterior flooring and general painting of the building. The tasks are confined to a sector of approximately 151.20 m2, where the inclement weather caused building damage. Conservation work is planned inside the building, with repair of sectors of the ceiling, exterior flooring and installation replacement with electrical devices. New JIN for Telén. With a budget of more than 110 million pesos and a construction period of 240 days, the new building for JIN 21 at Escuela 21 de Telén will be tendered. The building design considers as a basic premise to conserve the oldest and most abundant afforestation for being located in a semi-arid zone and weighing the best orientations towards classrooms and sectors of longer stay. The diagrammed distribution for the new building consists of a main axis with expansion in direct relation to the interior spaces, which allows their use simultaneously. In all cases, the spatial graduation is resolved with transition spaces, so necessary for the climatic characteristics of the locality. The main hall functions as an articulator, separating the spaces for the exclusive use of the school from the spaces that can be provided to the community (SUM) into functional packages. The building is removed from the axes, creating spaces that allow the development of activities related to kindergartens. A mixed traditional construction system is proposed, covered with slabs, the interior floors will be textured high-traffic rubber in the classrooms and granite mosaic in the rest of the building, the perimeter sidewalks and expansions will have tiles, the carpentry combines aluminum openings natural anodized and bent sheet metal access doors, all with safety glass. The air conditioning of the building will be carried out with central heating equipment with air distribution through sheet metal ducts and a fire safety system.
Country Argentina , South America
Industry Construction
Entry Date 07 Sep 2022
Source https://www.construar.com.ar/2022/09/la-pampa-licitara-obras-por-casi-4-000-millones-durante-septiembre/

Tell us about your Product / Services,
We will Find Tenders for you