3 The Order Of The Contract Is Named Later In The Instructions For The Object Or Subject Of The Order. 2. The Scope Of The Subject Of The Contract Includes, In Particular: 1) Selection Of Elements Of Modernization Of The Heating System For The Thermal Demand Of The Building, Including Gas Boiler Room Equipment To Properly Use The Heat Source; 2) Disassembly And Utilization Of Dismantled Gas Boilers Together With Boiler Equipment Requiring Replacement; 3) Delivery And Assembly Of A New Boiler System Powered By Gas Together With The Boiler Room. Ordering Party A Description Of The Modernization Of The Heating System; 4) Execution Of Starting And Starting The Boiler As Well As Checking The Correctness And Tightness Of Connecting The Boiler To All Cables, Including Gas And Combustion Installation; 5) Providing Updating The Documentation Of The As -Built Construction Project (In The Field Of Internal Central Heating Installation, Gas Boiler And Gas Installation For The Boiler Room) And The Project Of Notification To The Technical Supervision Office (Regarding. Modernization Or Liquidation Of Equipment Subject To Udt Supervision); 6) Conducting Training For 2 Persons Indicated By The Employer, In The Field Of Boiler Operation And Providing User Manuals In Polish3. In The Scope Of Modernization Of The Heating Installation, It Should Be Used: For The Boiler Room In Building No. 1 (White School) - Ul. Piastowska 5A: 1) Cascade System Of Four Condensing Boilers With A Total Power Not Exceeding 400 Kw With The Installation Of Fittings, Pipe Cables And Control; 2) Boilers: A) With Normalized Efficiency Of At Least 94% (Hs) / 109% (Hs); B) A Heat Exchanger Surface Made Of Stainless Steel Providing High Operational Reliability; C) With Cylindrical Gas Burner With A Long Life; D) With A Text/Graphic Regulator; E) Equipped With A Combustion Regulation System; F) With Integrated Protection Against Exhaust Gases; G) With A Class Of Energy Efficiency At Least A; H) Adapted For Wall Mounting Or Free -Standing On A System Frame; 3) Sps Chimney Insert With Suction Of Air From The Boiler Room Room; 4) Condensate Neutralizer; 5) Pur Cover In Pvc Installation Parameters; For Boiler Rooms In Building No. 2 (Red Glass) - Ul. Piastowska 5: 1) Cascade System Of Two Condensing Boilers With A Total Power Not Exceeding 200 Kw Along With The Installation Of Fittings, Pipe Cables And Control; 2) Boilers: A) With Normalized Efficiency Of At Least 94% (Hs) / 109% (Hs); B) The Surface Of The Heat Exchanger Made Of Stainless Steel Ensuring High Operational Reliability; C) Long -Life Gas Burner; D) With A Text/Graphic Regulator; E) Equipped With A Combustion Regulation System; F) With Integrated Protection Against Exhaust Gases; G) With The Class Of Energy Efficiency At Least A; H) Adapted For Wall Mounting; 3) Sps Chimney Insert With Suction Of Air From The Boiler Room Room; 4) Condensate Neutralizer; 5) Pur Cover In Pvc; 6) Safety Valves Adapted To Installation Operating Parameters.
Contact Information
Address
Gmina Susz,Susz,14-240,Warmińsko-Mazurskie,Pl621 - Elbląski
Contact No.
552786015
Email
susz@susz.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 98170263
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.