Water Purification Plant Construction Work - Donji Kraljevec Wastewater Treatment Plant, 2Nd Phase. The Subject Of Procurement Is The Construction Of A Wastewater Treatment Plant In Donji Kraljevec - 2Nd Phase. The Existing Donji Kraljevec Wastewater Treatment Plant Was Built Ten Years Ago, With A Capacity Of 4,500 Es (Inhabitant Equivalent), And Today It Is Used To Treat Wastewater From The Entire Area Of The Donji Kraljevec Municipality, As Well As The Čehovec Settlement From The Town Of Prelog. The Planned Expansion Of The Existing Device Will Increase The Total Treatment Capacity Of The Device To 9,000 Es, Which Will Enable The Connection Of The Settlement Of Goričan, As Well As The Connection Of Still Unconnected Users From The Area Of The Municipality Of Donji Kraljevec And The Settlement Of Čehovec. Therefore, The Subject Works On The Construction Of The 2Nd Phase Of The Donji Kraljevec Wastewater Treatment Plant Include The Reconstruction Of The Existing Treatment Plant, Which Includes An Increase In The Treatment Capacity From The Existing 4,500 Es To 9,000 Es, The Upgrade Of The Existing Technology To Iii. Degree Of Purification (Sbr Technology), And The Construction Of An Access Road. During The Reconstruction Works Of Upov Donji Kraljevec, The Reconstruction Works Must Be Carried Out In Such A Way That The Existing Technological Units Of Upov With The Existing Capacity Function Completely Smoothly. With Its Technical-Technological Solution, The Contractor Will Ensure The Phasing Of The Reconstruction Works, Which Will Fully Ensure The Smooth Operation Of The Existing, Constructed Technological Units Of Upov. The Works Under This Contract Consist Of: 1) Design (Main Project Of The Access Road, Changes And Additions To The Main Project Of The Wastewater Treatment Plant - Construction Of Phase Ii, Implementation Projects, Projects Of The Finished State) 2) Obtaining Approvals And Permits For Construction 3) Construction/Upgrading/Reconstruction Of The Existing Wastewater Treatment Plant With The Construction Of An Access Road 4) Trial Operation And Putting The Upgraded Wastewater Treatment Plant Into Operation 5) Training Of The Clients Staff 6) Proving The Required Parameters In The Trial Run And During Tests Upon Completion And 7) Elimination Of Defects During The Period Of Liability For Defects. Upov Consists/Will Consist Of: • Inlet Collector And Coarse Grating, Inlet Pumping Station, Mechanical Pretreatment, Collection/Equalization Basin, Biological Wastewater Treatment, Treatment Of Excess Biological Sludge/Gravity Thickener, Septic Tank Reception Unit, Polluted Air Treatment And Processing Of Other Waste, • Accompanying Infrastructure Facilities And Other Works (Administrative Building, Plant Building, Garage And Workshop, Laboratory, Connections, Internal Roads And Parking Lots, Fire Protection System, Internal Drainage System, Process Water Preparation System, Fence, Entrance Door , Landscaping, Surveillance System, Lighting, Signs, Etc.), • Access Roads, The Entire Infrastructure And Components Of Upov, And The Technical-Technological Requirements Are Described In Detail In Book 3 (Program Of Works - Clients Requirements). The Execution Of Works Within The Framework Of This Contract Includes Works In Accordance With This Documentation
|