The Following Activities Are Included In The Scope Of The Order For All Specific Positions: Designing - Preparation Of Technical Investment Projects For Objects In Specific Positions: Specific Position #1: Preparation Of A Technical Project For Anti-Erosion Strengthening, Through The Construction Of Hydrotechnical Facilities - Retaining Wall, Stabilization Of Slopes, Through Geostructures, Vertical Layout Of The Street Lane. Specific Item #2: Preparation Of A Technical Project For Anti-Erosion Strengthening Through The Construction Of A Hydrotechnical Facility (Hts) - Strengthening Hydrotechnical Facility - Stabilization And Drainage Of The Slope From Surface Waters Through Geoconstruction In The Investment Technical Project Phase The Scope And Content Of Each Of The Individual Items Is Specified In The Relevant Technical Specifications For Design (Technical Specification), An Integral Part Of This Public Procurement Documentation. The Term For The Implementation Of The Design Starts From The Date Of Providing The Source Information And Handing Over The Contract Letter And Ends With The Handover Of The Projects And The Signing Of The Acceptance-Handover Protocol By Authorized Representatives Of The Contracting Authority And The Contractor. The Protocol Is Drawn Up In Two Identical Copies, One For Each Of The Parties. The Stipulated Period Includes Only The Time For The Development Of The Projects, Without The Periods Of Providing Information, As Well As Those For Their Coordination And Approval. The Deadline For The Implementation Of The Design By Specific Positions Is As Follows: Separate Position #1: - 90 (Ninety) Calendar Days Separate Position #2: - 90 (Ninety) Calendar Days
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 73165408
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.