1. Subject Matter Of The Orderthe Subject Of The Order Is The Execution Of Preparatory And Earthworks Related To The Preparation Of The Area For The Implementation Of The Investment Entitled: Rescue Center - Headquarters Of The Bieszczady Emergency Spzoz In Sanok, Stage I - Consisting Of The Rescue Center Building, The Service Building And Warehouse And Utility Building, With 50 Parking Spaces On Plot No. 46/5, District 0004. The Works Should Be Performed In Accordance With The Design Documentation, In Particular With The Designed Elevations Of The Area, And Applicable Legal Regulations, Principles Of Technical Knowledge And Requirements Specified In The Order Documents. 2. Detailed Scope Of The Subject Of The Orderthe Scope Of The Order Includes In Particular: 1) Preparation And Tidying Up Of The Areathe Area Of The Plot Covered By The Order Is Overgrown With Shrubs And Other Vegetation. Before Commencing Earthworks, The Contractor Is Obliged To:• Clean Up The Area Covered By The Scope Of Works;• Remove Shrubs, Self-Seeding Plants And Other Vegetation Interfering With The Implementation Of The Investment;• Perform Grubbing, Including Removal Of Root Systems And Plant Remains;• Collect, Load, Transport And Manage The Resulting Plant Waste In Accordance With Applicable Regulations.2) Removing And Securing The Topsoil Layerremoving The Topsoil Layer With An Approximate Thickness Of 30-40 Cm, Moving It And Depositing It In A Designated Place On The Plot, In A Way That Protects Against Contamination And Enables Its Reuse At Later Stages Of The Investment Implementation.3) Earthworks And Leveling Of The Area. Execution Of Earthworks Including Detaching, Moving, Building And Spreading The Soil Within The Plot In Order To Obtain The Designed Terrain And The Required Height Elevations, In Accordance With The Design Documentation.4) Management Of Excavated Rockthe Rock Obtained During The Works Should Be Partially Left On The Investment Site To Be Used As A Foundation Material For Hardened Areas And For Works Related To The Foundation Of Buildings, In Accordance With The Design Documentation And Technical Requirements.5) Soil Compactionduring Works Related To The Movement, Installation And Preparation Of The Soil The Required Compaction Parameter Specified In The Design Documentation Should Be Ensured, I.E. Id = 0.95. The Contractor Is Obliged To Perform The Necessary Tests And Control Measurements Confirming The Achievement Of The Required Compaction Parameters And Present Their Results To The Ordering Party. 6) Management Of Excess Excavated Material. Approximately 10-15% Of The Remaining Excavated Material Should Be Left On The Plot To Be Used For Further Stages Of The Investment. The Remaining Part Of The Excavated Material Should Be Loaded, Transported Outside The Investment Area And Managed In Accordance With Applicable Regulations.7) Security Of The Work Areathe Contractor Is Obliged To Properly Secure The Work Area, Ensure The Safety Of Bystanders
Contact Information
Address
Bieszczady Emergency Services, Spzoz In Sanok,Sanok,38-500,Podkarpackie,Pl821 - Krośnieński
Email
zam.pub@bpr-spzoz.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120553901
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.