|
Bicycles - A System Of Shared Bicycles As Part Of The Itu Project Improvement Of The Public Transport System In The Urban Area Of Koprivnica. The Subject Of The Procurement Is The Establishment Of A New Bicko Public Bicycle System In The Area Of The City Of Koprivnica And The Municipalities Of Koprivnički Bregi, Koprivnički Ivanec And Peteranec. The Establishment Of The System Includes Procurement, Delivery, Assembly, Installation, Configuration, Testing, Commissioning, Training Of Operators And Service Personnel, And Handover Of A Complete And Functional System Of Public Bicycles. The System Is Established At Existing And New Locations. At The Existing Locations Of The Bicko System, It Is Necessary To Remove The Existing Equipment That Is An Integral Part Of The Current Public Bicycle System, Including Existing Pylons, Central Totems With Led Screens, Racks, Bicycles And Other Related Equipment, Before Installing New Equipment. Existing Power Connections, As Well As Canopies At The Locations Where They Exist, Are Not Considered Equipment To Be Removed, But Are Used As Part Of The Existing Location Infrastructure If They Are Technically Suitable For The New System. The Subject Of Procurement, Therefore, Includes The Establishment Of A Unique New System Of Public Bicycles At All Planned Locations, Regardless Of Whether They Are Existing Locations Of The Bicko System Or New Locations That Are Being Introduced Into The System. The Subject Of Procurement Includes The Establishment Of A New System Of Public Bicycles At A Total Of 21 Stations. Each Station Must Be A Functional Unit That, Depending On The Location And Available Infrastructure, Includes The Necessary Equipment For Picking Up, Returning, Parking, Locking And, Where Provided, Charging Of Electric Bicycles. As Part Of The System, It Is Necessary To Deliver, Assemble, Install, Configure, Test And Put Into Operation 147 Standard Conventional Bicycles With Gps Or An Equivalent Tracking System, One Conventional Tandem Bicycle For Two People With Gps Or An Equivalent Tracking System, And 69 Electric Bicycles With Gps Or An Equivalent Tracking System, 196 Racks For Parking Conventional Bicycles, 91 Racks For Parking And Charging Electric Bicycles, Equipment Necessary For The Functioning Of The Stations, Assembly And Fastening Of Equipment On The Previously Prepared Base, Installation And Testing Of The Complete System And A License For The Software Platform For Managing The System.
|