Test Drilling And Boring Work – (Provia Id 149096) Werndorf - Lebring; Double-Track Expansion; Planning. As Part Of The Double-Track Expansion Of The Southern Railway, Underground Exploration Is To Be Carried Out For The Werndorf-Lebring Section. In Order To Clarify The Subsoil And Groundwater Conditions, Core Drilling, Ramming And Exploratory Slots Are Planned. Some Of The Boreholes Will Be Converted Into Gauges Or Inclinometer Measuring Points. In Addition, An In Situ Test Program Is Planned In Selected Boreholes And Exploratory Slots. In Addition, As Part Of The Exploratory Work, An Access Road To The Öbb Route Is To Be Built At Km 79.4 Of The B67 Road. In Existing Buildings, This Route Is Intended To Be Used For Exploration For The Downstream Eia Process. These Include Ecological, Hydraulic Engineering And, If Necessary, Other Geological Investigations That Take Place On Site In This Area.
Contact Information
Address
Praterstern 3
Contact No.
+43 664 6176904
Email
manfred.lientschnig@oebb.at
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112526358
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.