|
Prior Information Notice For Laboratory, Optical And Precision Equipment (Excl. Glasses) – System For Deposition Of Organic Layers For Nanotechnology And Microsystems Technology. 1.1 1 Stk Glovebox Module: - Operation With N2 Protective Gas - Operation On One Side, Same Side As Existing Glovebox - Base Frame With Rollers And Height-Adjustable Machine Feet - Gas Chamber Including Side Walls - Chemical-Resistant, Transparent Front Made Of Polycarbonate Or Comparable Material With Glove Ports, Glove Hatches, Which Are Intended For Handling In The Vaporization Chamber, In An Oval Design, Preferably All Glove Hatches In An Oval Design - Glovebox Gloves, Material Butyl Rubber, Geometric And In Number Matching The Glove Bushings Offered, Size L - Closing Covers For Glove Hatches, Number Such That At Least One Hatch Of Each Type (Circular/Oval) Can Be Closed - Interior Lighting White, Glare-Free - Mounting Option For Bushings For Electricity, Gases Or Liquids - If Necessary For Design Reasons: Bushings For Connecting A Uvisel Plus Ellipsometer From Horiba - Dust Filter Hepa H13 At The Gas Inlet And Outlet - 1 Finished Power Feedthrough, Single-Phase 230V, With Power Distribution Strip Located In The Glovebox, At Least 4-Fold - N2 Gas Gun Inside The Glovebox With Supply Via Internal Gas Cleaning Or From External Inert Gas - All Modifications Required For The Installation Or Attachment And Operation Of The Chamber For Physical Vapor Deposition Specified Below 1.2 1 Pc Connection Of The Glovebox Module To Be Offered Here Existing Glovebox System Gb1500 From Sylatec, T-Lock - All Necessary Conversions To The Existing System Gb1500 For The Left-Hand Connection Of The Expansion, Work As Well As Materials And Other Expenses, The Conversions Are Preferably Carried Out At The Location Of The Overall Service, Otherwise Submit An Offer Including Transport Of The Existing System - Leak Test Of The Existing System After Conversions, It Must Be Shown That There Is No Measurable Deterioration In The Parameters In The Before-And-After Comparison, Which Is Due To The Conversions That Have Been Carried Out - The Possibility Of Transferring Samples And Substrates With A Diameter Of Up To 6 / 150Mm Between The Existing System And The Glovebox Module Under A Protective Atmosphere (N2), As Well As The Possibility Of Transferring Samples And Substrates With A Diameter Of Up To 6 / 150Mm Into And Out Of The Existing Glovebox As Well As The Glovebox Offered Here (T-Lock) - Connection Of The T-Lock External N2 Gas Supply For Filling And Flushing - All Pumps (Scroll Pump, Oil-Free, Specify Type), Hoses, Valves And Other Accessories Required For The Lock Process And Associated Operating States (E.G. Evacuation, Filling With Inert Gas, Flushing With Inert Gas, Other Necessary Operating States), Hoses, Valves And Other Accessories, Length Of The Hoses And Electrical Connections Such That The Pump Can Be Permanently Placed Under A Perforated Base At A Depth Of Approx. 120Cm Below Step Level, Vibration Decoupling To The Ground, Pump When Not In Use
|