|
Supply And Installation Of Galvanized World Worker And Wood Structure. Af03/2022 Ps, Paving Rental. Af 10/2018, Execution Of Deposit In A Workboard In Plywood Plate, Not Included Furniture. Af04/2016 (Comp. Mother - Sinapi 93584 - 12/2023, Administration And Work Control (Construction Of Accessible Sidewalks Alto Alegre Of Parecis), Demolition Of Curb. Ref: Compesa (10.04.03U), 31/07/2025, Demolition Of Cemented Sidewalk. Ref: Compesa (10.03.14U), Removal And Removal Of The Small Excavation, Excavation Mechanics With Backhoe In 1St Category Material, Reternal And Compaction With Vibratory Socket, Load, Maneuver And Discharge Of Soils And Granular Materials In Tilting Truck 6 M³ - Load With Loader (1, 7 To 2, 8 M³ / 128 Hp) And Free Discharge (Unit: M3). Molded In Loco, Made On Work, Conventional Finish, Not Armed. Af08/2022, 8 Cm Thickness, Armed. Af08/2022, Emerald Grass Planting Or São Carlos Or Curitibana, In Signs. Af07/2024, Masonry Of Ceramic Blocks Hoped Horizontal 9X19x19 Cm (9 Cm Thickness) And Concrete Mortar Mortada. Af12/2021, Chapisco Applied To Masonry And Internal Concrete Structures, With Bricklayer. Mortar 1: 3 With 400L Concrete Preparation. Af10/2022, Guide (Curb) And Concrete Conjugated Gutter, Molded On-Site Straight Stretch With Extruder, 45 Cm Base (15 Cm Base Of The 30 Cm Tab Base Of The Gutter) X 22 Cm Height. Af01/2024, Molded On-Site Curved Stretch With Extruder, White-Based (Kaiarction)-Based Curly Painting .Af05/2021, Alert Or Directional, Concrete Podotatile Flooring, Based On Mortar. Af03/2024, Final Cleaning Of The Work
|