Subscribe     Pay Now

Chad Project Notice - Gassi And Lamadji Solar PV Dtp


Project Notice

PNR 71456
Project Name Gassi and Lamadji Solar PV DtP
Project Detail The Project entails the design, construction and operation of two 15MWp solar PV plants close to the Lamadji and Gassi substations with a total capacity of 30 MWp, connected to the 90 kV loop around N’Djamena. The Project includes the construction of new substations and 14 kms (Lamadji 4 kms and Gassi 10 kms) of interconnection infrastructure, transferred to the national utility, Société Nationale d’Electricité (“SNE”), on project completion, and a 6 MWh Battery Energy Storage System (BESS) to support integration of intermittent generation to the grid. The Project is an important milestone in the Desert to Power (“DtP”) Roadmap and will build on the contractual structure and on Technical Assistance to SNE for the integration of Variable Renewable Energy (“VRE”)with the support of Sustainable Energy Fund for Africa (“SEFA”). The Bank’s involvement is expected through (i) an AfDB senior loan of up to EUR 13.5 million (ii) mobilization of a reimbursable grant to offset increased costs linked to the BESS component and (iv) provision of a PRG instrument with a face value of up to EUR 8 million (UA 6.58 million) backstopping a standby L/C which covers SNE payments following a request received from the Government of Chad (“GoC”). 50% would be covered by Green Climate Fund under DTP, and 50% covered by ADF, requiring an allocation of UA 0.82 million under ADF16. This project primarily contributes to climate mitigation results. As such, 100% of the total approved amount is attributed as climate finance, of which 100% is dedicated to mitigation. Project Objectives The Project will replicate the contractual structure of the Djermaya project. It will displace 61 GWh of high cost HFO/diesel generation thereby reducing government subsidies to the national utility. It will form a major part of the country’s approach to sustainable development, delivering benefits in climate mitigation -through reducing GHG emissions by 49kt CO2e per annum -and adaptation by diversifying energy supply options away from fossil fuel sources. Beneficiaries The construction phase is expected to provide temporary employment for 200 individuals, with 15% of these jobs designated for women and 60% for youth. Being in the renewable energy sector, these are green jobs that will support the country in its transition towards green growth. The operations will create 34 permanent jobs and 30 temporary jobs, maintaining the same inclusivity targets of 15% women and 60% youth, for the duration of the PPA. This corresponds to 60 fulltime equivalent (FTE) jobs during both construction and operation.
Funded By African Development Bank (AfDB)
Sector Energy, Power and Electrical
Country Chad , Central Africa
Project Value XAF 16,027,742

Contact Information

Company Name Société Nationale dElectricité (SNE)
Address Name Matthieu Benoit JALARD Email m.jalard@afdb.org

Tell us about your Product / Services,
We will Find Tenders for you