Project Detail |
Project Name Muara Laboh Geothermal Power Project Stage 2 Project Number 57311-001 Borrower / Company PT Supreme Energy Muara Laboh Country / Economy Indonesia The project will (i) develop geothermal steam resources through production and injection facilities in the Liki Pinangawan Muara Laboh concession area; and (ii) construct, operate, and maintain of a new 82.7 megawatt (MW) net capacity geothermal power plant. The new plant will operate in conjunction with the existing power plant financed by ADB. The two plants will aggregate to a total net capacity of 168.7 MW. The project will (i) develop geothermal steam resources through production and injection facilities in the Liki Pinangawan Muara Laboh concession area; and (ii) construct, operate, and maintain of a new 82.7 megawatt (MW) net capacity geothermal power plant. The new plant will operate in conjunction with the existing power plant financed by ADB. The two plants will aggregate to a total net capacity of 168.7 MW. Objectives and Scope ADBs assistance will support Indonesias Nationally Determined Contribution targets under the Paris Agreement to reach net-zero carbon emissions by 2060 and increase the share of renewable energy in total generation to 24.8% of total generation capacity by 2030, a target set by PLN, the national power utility. Additionally, supporting geothermal project contributes to these targets given Indonesia has the worlds largest geothermal energy potential. |