Project Detail |
Project Description South Negros Bio Power, a collaboration between ThomasLloyd CTI Asia Holdings Pte and Bronzeoak Philippines (currently known as AC Devco), is a Biomass Power Plant which has an output of 24.99 MW and located in La Carlota City, Negros Occidental, Philippines. The power plant will primarily use cane trash as well as wood and grass as main fuel. It will be utilizing local feedstock of about 220,000 tonnes per year. The plant will be connected to the existing 69 kV substation in San Enrique, which is 8km away to provide electricity to the urban centre and rural areas in the island of Negros. Pöyry’s Scope of Services Pöyry Energy, Inc. provided Owner’s Engineer services for the South Negros Biomass project which includes the following: · Review services for the engineering design · Site supervision · Project management services |