Togo Project Notice - Rural Electrification Project By Mini Solar Power Plant In Togo


Project Notice

PNR 33685
Project Name Rural electrification project by mini solar power plant in Togo
Project Detail CORRIDORS MANAGEMENT PLAN FOR THE RING OF GROWTH IN WEST AFRICA (WAGRI-CACAO) 1. TITLE: Rural electrification project by mini solar power plant in Togo 2. COUNTRIES OF INTERVENTION: TOGO 3. AREA OF INTERVENTION: The whole extent of the territory 4. AREAS OF INTERVENTION: Energy 5. Strategic axis of the management plan: Button A, development of economic sectors 6.JUSTIFICATION OF THE PROJECT: In order to achieve Goal 7 of the SDGs and boost economic development in rural areas, the Government of Togo has developed, through the Ministry of Mines and Energies, a rural electrification strategy. The main objective of this Togo electrification strategy is to reach the governments vision of access to electricity in order to achieve a 90% access rate by 2028. The access rate at the end of 2016 was 36% at national level, 6% in rural areas. The strategy highlights the need to electrify isolated mini-grids based on renewable energies, a number of localities, whose population is dense but away from the network. This choice is justified by techno-economic considerations. Indeed, the geographical position of the localities concerned in relation to the network does not justify their connection to the network. The strategy is also based on the involvement of the private sector, the public sector can not mobilize alone the volume of investment needed to achieve the objectives. In order to allow these populations living far from the existing network to access modern electricity services, thus increasing the rate of access to electricity in Togo, the Togolese Government has undertaken a rural electrification program. decentralized by photovoltaic solar system. The number of localities to be electrified is 317 throughout the national territory. This project is divided into five lots, the unit costs of which will be determined at the end of the studies. 7. MAJOR STAKEHOLDERS Project Manager: Togolese State (Ministry of Mines and Energy) / Togolese Rural Electrification and Renewable Energy Agency (AT2ER) Project management: Firm / company to recruit Beneficiaries: Population in project areas, small and medium enterprises, small and medium industries Other stakeholders: Ministries responsible for the agriculture, industry, trade and local government sectors. Coordination and monitoring and evaluation The monitoring and evaluation missions will be carried out by the Monitoring and Evaluation Division of the Togolese Rural Electrification and Renewable Energy Agency (AT2ER). Monitoring and evaluation will make it possible to monitor the proper execution of construction, installation and operation works under the conditions defined by the various contracts. 8. STRATEGIC DIRECTIONS General Objective (Goal): Contribute to the increase of the electrification rate of the national territory Specific objectives: 1. Increase the rate of rural electrification 2. Promote renewable energies Expected results : (Deliverables) 1. Energy is available to rural households 2. The share of renewable energies in the energy mix is ??increased Main activities : 1. Conduct a thorough environmental and social impact assessment 2. Perform the civil works 3. Perform electrical engineering work 4. Set up a technical and commercial operating system Environmental and social impact: In-depth environmental and social impact assessments will include measures to reduce negative effects on the social and physical environment 9. FINANCING PLAN Estimated cost of the project: 147,000,000,000 CFA francs Amount mobilized: CFAF 21,000,000,000 Rate: 14% Source Amount Financing instrument (PPP, State Budget, Loan, Other) F CFA USD State: 21,000,000,000 38,181,818 Loan (BOAD) Private promoter: Development partners: Private partners: 126 000 000 0000 229 090 910 PPP Remaining to be mobilized: 126 000 000 000 229 090 910 Rate: 86% 10. DURATION - MAIN STAGES OF THE PROJECT Estimated completion time 12 months Start date: Has determined End date: Has determined
Funded By Self-Funded
Sector Energy & Power
Country Togo , Western Africa
Project Value XOF 147,000,000,000

Contact Information

Company Name Togolese Rural Electrification and Renewable Energy Agency (AT2ER)
Address Tokoin Gbonvié, not far from ATBEF 14 BP 128 Lomé - Togo Tel: (+228) 22 21 21 44 | (+228) 22 21 21 66 Email: info@at2er.tg | at2ertogo@gmail.com
Web Site http://www.uemoa.int/sites/default/files/bibliotheque/fiches_projets_togo.zip

Tell us about your Product / Services,
We will Find Tenders for you