Iran Project Notice - NGL-3100 Plant Is Being Designed And Constructed


Project Notice

PNR 21723
Project Name NGL-3100 plant is being Designed and Constructed
Project Detail As another significant project in NGL industry, NGL-3100 plant is being designed and constructed by OIEC near the oil production unit of Cheshmeh khosh, a town in Ilam Province. The project is defined to reach the optimal recovery of C2+ product from the associated gases of North Dezful oil fields that at present are being burnt causing both pollution and noticeable losses of gas revenues. This project includes a high pressure electrical power grid consisting of transmission lines and stations. It also includes feed and product pipelines. Location Clienl Ham / Iran Iranian Central Oil Fields Company (ICOFC) OIEC Scope Engineering (basic design and detailed design) Procurement (supply of the equipment and bulk items, procurement services) Construction (site preparation, plant construction and erection) Commissioning (pre-commissioning, commissioning and start-up) Value 1.5 billion USD Output C2+: 46,000 barrels per day Stabilized Sour Condensate: 1180 barrels per day Sweet Gas: 2.2 million m1 per day Sour Gas: 2.9 million m3 per day
Funded By Other Funding Agencies
Sector Oil and Gas
Country Iran , Western Asia
Project Value IRR 1,500,000,000

Contact Information

Company Name Iranian Central Oil Fields Company (ICOFC)
Web Site http://www.oiecgroup.com/SitePages/website/ngl3100.html

Tell us about your Product / Services,