Work Detail |
NLC India Limited is inviting online bids for the establishment of a 100 MW ISTS (Inter-State Transmission System) connected Solar Power Project on a nationwide scale, inclusive of operation and maintenance services for a period of 3 years. The tendering process will follow the e-Tendering method with a two-cover system.
Interested parties can obtain the tender document at a non-refundable cost of Rs. 20,000/-. To participate, a bid guarantee of Rs. 2,46,30,000/- is required. A pre-bid meeting is scheduled for January 8, 2024, at 11:00 AM (IST) through a Video Conference.
The deadline for online bid submissions, including Part-I, Part-II, and the physical cover, is set for January 18, 2024, at 2:30 PM (IST). The opening of Part-I and the physical cover will take place on the same day at 3:00 PM (IST). The date and time for the opening of Part-II (Price Bids) will be communicated later.
This initiative aims to facilitate the deployment of 100 MW solar power across India through a transparent and competitive bidding process, emphasizing both the initial setup and subsequent maintenance of the solar power project over a three-year period. |