Work Detail 1.2MW Dragon 12 kite installation will use the system at a site in Vestmanna, Faroe Islands Tidal power technology outfit Minesto has completed the build and functional testing of seabed connection system for its installation in Vestmanna, Faroe Islands. The connection is for the 1.2MW Dragon 12 tidal power plant and is a scale-up and further enhancement of Minesto’s verified LARS (Launch & Recovery System) technology, a principle applied and proven by the company since 2020. The Dragon 12 kite installation will use the system to enable a fast launch by towing with a small work boat and “one-stab” connection. The system is remotely operated and controlled from the surface vessel by lowering the LARS frame attached to the male connector into the female connector in the foundation. In the bottom joint, the power, data and strength connections are all combined. The process is cost-effective and safe: solely monitored by cameras on the frame, no diver, or remotely operated vehicle (ROV) support is required. “Our unique connection system shows the core of our innovative technology – fast, efficient, and easy to handle,” said Martin Edlund, CEO of Minesto.
Country Denmark , Western Europe
Industry Energy & Power
Entry Date 22 Aug 2023
Source https://renews.biz/87631/minesto-completes-connection-testing-for-tidal-project/

Tell us about your Product / Services,
We will Find Tenders for you