Argentina Procurement News Notice - 35092


Procurement News Notice

PNN 35092
Work Detail The works will require an investment of more than 634 million pesos and a term of two years. The work will cross the Industrial Park of Puerto Madryn and will enhance one of the main tourist spots in the area, declared a World Heritage Site by UNESCO. At noon this Tuesday, the tender was opened to execute basic works, granular structure and flexible pavement on Provincial Route No. 42, at the access to El Doradillo Beach. The works, which will require an investment of more than 634 million pesos, will cross the Puerto Madryn Industrial Park and will allow the promotion of one of the main tourist spots in the area, declared a World Heritage Site by UNESCO. The call for Public Tender No. 15/22 allowed the presentation of three offers corresponding to the company Rigel SRL, which offered a sum of 1,252,033,286.80 pesos; Choel Construcciones SRL quoted 789,013,368.42 pesos and, finally, LAL SA, which was presented with an amount of 851,947,754.42 pesos. Madryn: after the pandemic they reactivate the program "The boys welcome the whales" The event took place at the facilities of the Provincial Road Administration in Rawson. The governor of Chubut, Mariano Arcioni; Lieutenant Governor Ricardo Sastre; the mayor of Puerto Madryn, Gustavo Sastre; the Ministers of Tourism, Leonardo Gaffet; and Infrastructure, Gustavo Aguilera; the undersecretary of Conservation and Protected Areas, Sergio Cassin; the municipal Secretary of Tourism and head of the Mixed Entity, Marcos Grosso; among other provincial and local cabinet officials and authorities from different chambers. The act, which took place in Rawson, was attended by the Governor of Chubut, Mariano Arcioni. The act, which took place in Rawson, was attended by the Governor of Chubut, Mariano Arcioni. The police burned 3 tons of marijuana and drugged the entire town THE WORK The works include the paving of Provincial Route No. 42 between the junction with Provincial Routes No. 1 and No. 2, Section I. The work goes from the junction with Route No. 1 to Km 11.2, crossing the Industrial Park from Puerto Madryn. The projected pavement has as guidelines the maximum economy and the least environmental impact. A limited road width (6.70 meters) will be built, with reduced shoulders (2 meters on the left side and an extension to 3 meters on the right side to include a bike lane). In order to maintain a reduced speed, which minimizes the running over of wildlife, speed reducers type "hills" will be built at strategic points, as well as optical sound strips. "El Doradillo" is a tourist area where land-based whale watching is carried out. Photo: file. "El Doradillo" is a tourist area where land-based whale watching is carried out. Photo: file. He took the entrance exam with inclusive language: they gave him a “une” At the access point to the Protected Natural Area, an extension and central flowerbed suitable for a control box and/or control barrier, as well as access to a box, have been planned. reports, and parking area. It also includes complementary works such as horizontal and vertical signage, works of art (sewers, lined gutters, sewer discharge, etc.), fences and gates if necessary, among others. The term of execution of the works is 24 months and the official budget amounts to 634,219,337.84 pesos. ACCESSIBILITY The main objective is the improvement of this Provincial Route, which has a significant traffic load, since it not only links the areas of the Industrial Park and the city center, through Provincial Route No. 1, but it is also an important route to access the main tourist points of the area declared a World Heritage Site by UNESCO in Argentina. Next Thursday is a national holiday: will it be a "bridge" and will it become a long weekend? Mainly it allows the entry and exit of vehicles to the "El Doradillo" area from the city of Puerto Madryn, this being the main tourist attraction, related to the coastal sighting of the Southern Right Whale.
Country Argentina , South America
Industry Construction
Entry Date 11 May 2022
Source https://www.construar.com.ar/2022/05/licitaron-la-obra-de-pavimentacion-de-el-doradillo-y-se-presentaron-tres-ofertas/

Tell us about your Product / Services,
We will Find Tenders for you