Argentina Procurement News Notice - 23872


Procurement News Notice

PNN 23872
Work Detail Envelopes were opened for the work Public lighting -Light lighting- First stage for the city of San José de Feliciano. It was at the headquarters of the Administrative Commission for the Special Fund of Salto Grande (Cafesg). The work, called Private Bid No. 01/2019, has an official budget of 4,073,300.06 pesos and this is the second call since on the previous occasion it was declared void due to irregularities in the bidders. On this occasion, two bidders were presented, the first envelope corresponded to the company “IME SRL”, who quoted the work to be done in 4,692,733 pesos and the second offer was made by “Guerrero Electricidad SRL” that budgeted the work to be specified in 5,182,870.58 pesos. Present at the opening ceremony was the Cafesg Project Control coordinator, engineer Gustavo Larenze, the clerk Guillermo Gómez and company representatives. All the documentation included in the envelopes that contained the economic proposals for the works, will be analyzed by an evaluation commission made up of professionals from the Cafesg, which will advise the award to the board of the provincial agency in a peremptory period. The play The Executive project consists of the design of public lighting in various streets of the urban area and section of the Ring Road of the city of San José de Feliciano, province of Entre Ríos. The scope is established from the lighting design through the choice of technology, power and location on the floor of each point of light, to the calculation of the different power and protection lines as well as the necessary civil works. Location and quantities Ring road, direction N - S from the intersection with access to provincial route No. 1 and neighborhood street, length 700 meters, quantity 24.- Eva Duarte de Perón Street, direction N - S, between Rivadavia and Belgrano streets, quantity 5.- Diamante Street, direction N - S, between Rivadavia and Belgrano streets, quantity 5.- Nogoyá Street, direction N - S, between Rivadavia and Belgrano streets, quantity 5.- Leandro N. Alem Street, direction N - S, between Belgrano and Bolívar streets, amount 15.- Calle España, direction N - S, between San Martin and Hipólito Irigoyen streets, quantity 5.- Villaguay Street, direction N - S, between San Martin and Hipólito Irigoyen streets, quantity 5.- The lighting will be achieved through the installation of luminaires equipped with light emitting diodes (LED), taking into account their high light output, long service life and economy in the consumption of electrical energy. The luminaires will be mounted on curved arm metal columns 7 and 9 m high. Each luminaire will come equipped with devices for short circuit protection. The underground distribution network will be carried out directly buried, in the case of the illumination of the ring road, within the urban area, the feeding will be carried out in an aerial way, connecting directly to the existing lines. Each section of lighting will be commanded by a control and protection cabinet. 24 led luminaires of 139 w and 40 led luminaires of 42 w will be installed, suitable for street lighting, The deadline for the completion of the works is 90 calendar days, counted from the signing of the Start Act.
Country Argentina , South America
Industry Energy & Power
Entry Date 30 Sep 2019
Source http://www.construar.com.ar/2019/09/7824-ofertas-para-el-rediseno-del-alumbrado-publico-de-algunas-calles-de-feliciano-5-millones/

Tell us about your Product / Services,
We will Find Tenders for you