Vietnam Procurement News Notice - 23609


Procurement News Notice

PNN 23609
Work Detail (TDT) - In the first 8 months of 2019, Vietnam Rubber Industry Group has selected contractor selection for 145 bidding packages with a total price of 503 billion VND. In particular, only 6 bidding packages applied online bidding with low competition. Specifically, in these 6 bidding packages, there are 3 bidding packages with only 1 tenderer participating, the remaining 3 bidding packages have 2 bidders participating in each package but 1 contractor failed due to confusing reasons. Monitoring the progress of the process of selecting contractors online at the six bidding packages mentioned above shows that, among 3 bidding packages, only 1 contractor attended, Tung Duy Duc Co., Ltd. (Binh Phuoc) attended and was selected the Package of Construction and Upgrading, asphalt road to transport latex from the beginning of Lot 5 to the adjacent road of Phu Loi Village - Phu Rieng Do Farm - Phu Rieng Rubber Company Limited. This is also the only bidding package that Tung Duy Duc contractor has announced to be awarded the bid for more than 3 years. Similarly, the Branch of Thanh Minh Construction and Investment Design Consultancy Co., Ltd. (Binh Phuoc) is the only contractor that participated and won the Construction Package of Upgrading Works, asphalted road to transport latex from Lot 75 to the end of Lot 80 Group 9 - Minh Hung Farm - Phu Rieng Rubber Company Limited. This is the third bidding package that Thanh Minh contractor won at Phu Rieng Rubber One Member Company Limited. According to the Bidding Newspapers data, over the past 3 years, Thanh Minh Contractor was announced to have won a total of 7 bidding packages, mainly implemented in Binh Phuoc province. In particular, in the Package Construction of 12 functional rooms at Tan Xuan C Primary School, TP. Dong Xoai, Binh Phuoc province, Thanh Minh Contractor bids without competing with other contractors. Also because there were no competitors, Toan Tri Equipment Co., Ltd. bid and was selected to win the Package of Automobile Technology Training Equipment Upgrade Package of the Driving Training and Examination Center, High Industrial College. su. 1 of 2 "sliding" contractors For the remaining 3 bidding packages, Truong Tho Co., Ltd. participated and won 2 packages, including: Construction and installation package under the Project of upgrading rubber workshop at the Central Processing Factory - Rubber One Member Company Limited Phu Rieng (hereinafter referred to as Package XL1) and Construction Package: Upgrading, asphalt road to transport latex from the work of Group 8 to the junction of Block 65, Lot 66, Lot 47 - Nong Truong Tho Son - Phu Rieng Rubber Company Limited (hereinafter referred to as Package XL2). In Package XL1, participating with Truong Tho Contractor but failing to win the tender was Tung Duy Duc Company Limited. According to the evaluation of the Bidding Expert Group, E-HSDT of Tung Duy Duc Contractor was excluded because: The contractor declared its own revenue of more than 3,677 billion VND, while E-HSMT required the average annual revenue in Within the last 3 years, the minimum is VND 5.48 billion. The Contractors financial resource to execute the Package is 109 million VND, which does not meet the E-HSMT requirement of 1.09 billion VND (10 times lower than the requirement). E-HSDT of Contractor Tung Duy Duc only meets half of the requirements for major construction equipment (portable drilling machines) ... In the XL2 Package, Tan Hoang Minh Construction Joint Stock Company (Binh Phuoc) failed the bid because: There are no documents proving that there is a dumping ground for materials; no explanation on water drainage, transportation and communications during construction; The warranty period for the project is only 12 months, while E-HSMT requires a minimum of 18 months ... In addition to the XL1 Package, Tung Duy Duc Contractor also participated in the Construction and Installation Package of the Fence Improvement Project, the spiritual house, SÐNB, renovating the memorial, the administrator, the lighting system, the toilet. birth, water supply systems, wells, drainage systems, trees of Phu Rieng Rubber One Member Company Limited. In this package, while Nam Tien Consulting and Development Investment Co., Ltd. was selected to win the bid, Tung Duy Duc Contractor was eliminated because he did not meet the minimum turnover requirement of 9.9 billion VND; similar contract value (4.7 billion dong); key personnel - chief commander ... Even, E-HSDT of Contractor Tung Duy Duc did not declare information about the main construction equipment.
Country Vietnam , South Eastern Asia
Industry Rubber
Entry Date 20 Sep 2019
Source https://baodauthau.vn/dau-thau/tap-doan-cong-nghiep-cao-su-chon-nha-thau-qua-mang-it-goi-thau-canh-tranh-thap-108214.html

Tell us about your Product / Services,
We will Find Tenders for you