| Work Detail |
The photovoltaic installation will have a power of 10 kW and will be integrated with a mini wind turbine of 1 kW. The National University of Hurlingham (UNAHUR), which is located in the town of Hurlingham, in the Argentine province of Buenos Aires, has announced having received the necessary equipment for the construction of a solar wind hybrid project. It consists of 40 solar panels, 40 power optimizers, an intelligent three-phase inverter, aluminum triangles for laying and concrete blocks for fixing in the installation area, the institution said in a statement. The photovoltaic installation, which will have a power of 10 kW, will supply the laboratories in the N ° 1 Malvinas Argentinas building of the university. In sum with the installation of the photovoltaic generation system, the incorporation of a wind generator of at least 1 kW of power is foreseen to form a hybrid supply system (solar and wind energy) that, at the same time, will be used to to feed cell phone chargers for the university community, among other applications, UNAHUR added. |