Subscribe     Pay Now

Oman Procurement News Notice - 14165


Procurement News Notice

PNN 14165
Work Detail Muscat Municipality is exerting great efforts in various sectors of municipal work in accordance with a strategy and a well thought-out vision that takes into consideration the criteria of sustainable development based on development and quality in the implementation of service works. The municipality oversees various service sectors in Muscat Governorate. Landscaping, sanitation of the city, establishment of parks, parks, childrens playgrounds, green spaces, organization and follow-up of markets, technical and health inspections, village and residential development, aesthetic touches on the debtor Road projects The Municipality of Muscat opened last year the double project of Al Khod Street in front of traffic, with a total length of 3200 meters. The road extends from Sultan Qaboos University roundabout to intersection No. 12 on Muscat Highway and 3 lanes in each direction. , And free lanes were set up for the outgoing movement from Sultan Qaboos University to the university roundabout as well as for the movement coming from Muscat Highway on the same circle. Al Khod Street through the direct entrances and exits in For the protection of the road, boxes were constructed with 10 cells to drain rainwater in four locations along the road, lighting the road in accordance with the approved specifications and establishing pedestrian corridors (6 km) long. The Municipality of Muscat has started the construction of the internal roads in Al-Atkiya industrial area in the Wilayat of Al-Amirat. The project will connect the area with Al-Amratat Qaryat main road and open the main asphalt roads with the plan. In order to complete the road rehabilitation and protection program, the Municipality of Muscat has made improvements and rehabilitation on the road in the Khiran area in the State of Muscat with a length of 2 km as part of the project to develop and improve the Yiti-Sifa road. This part represents a straight path without any winding pathways, and replaces the previous path adjacent to the shore of the Khiran area, which is steeped in sharp horizontal and vertical curves. Among the other works that were completed soon, the single road from the Sifah area to the area of ??Bezum with a length of 9 km, in addition to part of the road leading to Wadi Zakt area with a length of 2 km. From Bar-Jissah roundabout to Al-Sifa area with a length of (22.5) Km, and lighting of (17) Km, including the project work protections of the existing road in the area Sifa.
Country Oman , Western Asia
Industry services
Entry Date 24 Jul 2018
Source https://www.gulfeyes.net/oman/2711836.html

Tell us about your Product / Services,
We will Find Tenders for you