1. The Subject Of The Contract Is The Performance Of The Task Entitled: Thermomodernization Of The Tso Building In Suchedniów. 2. The Task Will Be Implemented Based On The Energy Audit Of The Building, The Buildings Energy Review And Technical Documentation Entitled: Energy Modernization Of The Volunteer Fire Brigade Building In Suchedniów At 11, 26 - 130 Suchedniów Ul. 3. The Task Is Located On The Plot With Survey Number. 1320/16 Precinct 0001 Suchedniów, Commune Of Suchedniów, Skarżyski Poviat, Świętokrzyskie Voivodeship. 4. The Property Has Access To The Water Supply Network, Sanitary, Gas And Electric Sewage Systems. 5. As Part Of The Planned Investment, The Following Works Are Assumed: - Insulation Of External Partitions Using The Etics Method Using 15 Cm Thick Polystyrene Boards, Insulation Of The Ceiling Under The Unheated Attic Using 25 Cm Thick Mineral Wool And Communication There, Insulation Of Foundation Walls And Flies Using Extruded Polystyrene Thickness 12 Cm, Replacement Of Horizontal Insulation And Horizontal Insulation, Vertical Moisture Of Foundations. - Modernization Of Window Joinery And External Doors With A Heat Transfer Coefficient In Accordance With The Design Documentation, - Modernization Of Central Heating Installations - Replacement Of Radiators (8 Pcs) With New, Low -Temperature With Thermostatic Valves, - Replacement Of Lighting Fittings (20 Pcs. New Flashings, Window Sills, Gutters And Downpipes, Making A New Silicone Plaster On The Outer Walls. The Facade Will Be Kept In Bright Colors. Color To Be Agreed With The Ordering Party During The Works. - Cleaning And Reproductive Works Surrounded By The Building (Pavements, Band, Waterproofing). - The Contractor Will Be Obliged To Prepare The As -Built Energy Audit After Completing The Work. The Audit Should Assume Measurements And Studies Confirming The Performance Of Solutions That The Documentation And Energy Audit Attached To These Proceedings Assumed. - In Case Of Need, The Contractor Will Be Obliged To Prepare An Ornithological And Chiropterological Study. Note: The Contracting Authority Informs That The Work Will Be Carried Out At An Active Facility. The Firehouse Is Used By The Bridesmaids Of The Volunteer Fire Brigade In Suchedniów. The Unit Is Reported To The National Rescue And Fire Fighting System, Which Means That It Is Available For Action By The Poviat Fire Brigade In Skarżysko - Kamienna. The Schedule And Implementation Of Works Must Be Prepared And Organized In Such A Way That They Allow The Functioning Of Osp Suchedniów. 6. The Subject Of The Contract Is Described In Detail In: - Technical Documentation Together With The Sst - Constituting Annex 1 To Swz, - Energy Audit Of The Building And The Energy Review - Annex 2 To Swz - Auxiliary To The Documentation Was Attached To The Bill Of Quantities - Annex 1 To Swz. The Bill Of Quantity Is Only Illustrative, The Contractor Is Obliged To Quote Works On The Basis Of Technical Documentation, Audit And Energy R
Contact Information
Address
Gmina Suchedniów,Suchedniów,26-130,Świętokrzyskie,Pl721 - Kielecki
Email
agnieszka.jaszczur@suchedniow.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 99961122
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.