|
1.1.2 Shop With Wood Plywood. Af_05/2018, 1.1.3 Conventional Leasing Of Work, Using Potched Running Tablets Every 2.00M - 2 Uses. Af_10/2018, 1.1.4 Execution Of Cafeteria In A Work Plate Of Plywood, Not Included Furniture And Equipment. Af_02/2016, 1.1.5 Execution Of Toilet And Locker Room In A Work Site In Plywood Plate, Not Included Furniture. Af_02/2016, 1.1.6 Execution Of Deposit In The Construction Site In Plywood Sheet, Not Included Furniture. Af_04/2016, 07/22/2025, 1.1.7 Execution Of A Construction Site Armor, Not Included Furniture And Equipment. Af_04/2016, 1.1.8 Execution Of Fabric Central, Mortar Production Or Concrete Workshop, 1.1.9 Execution Of Office In Masonry Surgers, 1.2.1 Mechanized Cleaning Of Plant Layer, Vegetation And Small Trees (Diameter Of Trunk Less Than 0, 20 M), With Treadmills. Soils And Granular Materials In 6 M³ Tilting Truck - Load With Loader (1, 7 To 2 Bucket, 8 M³ / 128 Hp) And Free Discharge (Unit: M3). Af_07/2020, 1.2.3 Transport With 6 M³ Tilting Truck, In Paved Urban Road, Additional To Excess Dmt To 30 Km (Unit: M3xkm). Af_07/2020, 1.3.1.1.1 Mechanized Excavation For Mini-Slave Bucket Beam (Including Excavation For Formal Placement). Af_06/2017, 1.3.1.1.2 Mechanized Ditch With Backhoe (Retro Bucket Capacity: 0, 26 M³/Power: 88 Hp), Width Of 0, 8 To 1, 5 M, Depth To 1, With Soil (Without Replacement) Of 1St Category, With Vibratory Plate. Af_08/2023, 1.3.1.2.1 Pre-Molded Concrete Stake, Square Section, Capacity Of 25Tocks, Included Amendment (Exclusive Mobilization And Demobilization). Af_12/2019, 1.3.1.2.2 Mechanical Devastation Of Reinforced Concrete Pile, Diameters Up To 40 Cm. Af_05/2021, 1.3.1.2.3 Block Frame, Baldrame Beam And Shoe Using 5 Mm Ca -60 Steel - Assembly. Af_06/2017, 1.3.1.2.4 Block Frame, Baldrame Beam Or Shoe Using 6, 3 Mm Ca -50 Steel - Assembly. Af_06/2017, 1.3.1.2.5 Block Frame, Baldrame Beam Or Shoe Using 8 Mm Ca -50 Steel - Assembly. Af_06/2017, 1.3.1.2.6 Block Frame, Baldrame Beam Or Shoe Using 10 Mm Ca -50 Steel - Assembly. Af_06/2017, 1.3.1.2.7 Block Frame, Isolated Shoe, Baldrame Beam And Running Shoe Ca -50 Steel Of 12, 5 Mm - Assembly. Af_01/2024, 1.3.1.2.8 Frame Of Pillar Or Beam Of Conventional Reinforced Concrete Structure Using Ca -60 Steel Of 5, 0 Mm - Assembly. Af_06/2022, 1.3.1.2.9 Frame Of Pillar Or Beam Of Conventional Reinforced Concrete Structure Using Ca-50 Steel Of 10, 1.3.1.2.10 Frame Of Pillar Or Conventional Reinforced Concrete Structure Using 12, 5 Mm-Assembly Ca-50 Steel. Af_06/2022, 1.3.1.2.11 Frame Of Pillar Or Beam Of Conventional Reinforced Concrete Structure Using Ca-50 Steel Of 16, 1.3.1.2.12 Frame For Execution Of Radier, Concrete Floor Or Slab On Soil, Using Q-138 Screen. Af_09/2021, 1.3.1.2.13 Fabrication, Assembly And Disassembly Of Decoration Block, In Sawn Wood, And = 25 Mm, 4 Uses. Af_06/2017, 1.3.1.2.14 Fabrication, Assembly And Disassembly Of Baldrame Beam, 4 Uses. Af_01/2024, 1.3.1.2.15 Skinny Concrete Ballast, Applied To Crown Blocks Or Shoes. Af_08/2017, 1.3.1.2.16 Concrete Fck = 30 Mpa - Confection In Center
|