The Subject Of The Contract Is The Execution Of Works Consisting In: Renovation Of Elements Of A Single -Family Residential Building - Foresters Starosiedle And Thermo -Modernization. The Construction Of The Building Is Founded On A Set Similar To A Rectangle. The Main Roof Of The Steep, Gable Building With A Slope Angle 43º, The Height Of The Building From The Level Of The Area To The Ridge Is 9.44M Above Sea Level. The Body Of The Building Remains Unchanged. Thermomodernization Of A Single -Family Residential Building Is Designed. The Scope Of Thermo-Modernization Includes:- Insulation Of Internal Walls,- Attic Insulation,- Replacement Of External Joinery,- Renovation Of The Entrance To The Building,- Replacement Of Roofing,- Replacement Of External Lighting Fittings,- Refreshment Of Internal Walls And Ceilings- Painting And Replacement Of Tiles In Sanitary Rooms,- Accompanying Works. The Thermomodernization Of A Single -Family Residential Building Was Designed For Journal Of Laws No. 614, 159/4 Within Biecz, The Brody Commune. The Building Of The Building Is Founded On A Set Similar To A Rectangle. The Main Roof Of The Steep, Gable Building With A Slope Angle 43º, The Height Of The Building From The Level Of The Area To The Ridge Is 9.44M Above Sea Level. The Body Of The Building Remains Unchanged. The Thermomodernization Of A Single -Family Residential Building Is Designed. The Scope Of Thermomodernization And Includes:- Insulation Of External Walls,- Attic Insulation,- Replacement Of External Joinery,- Renovation Of The Entrance To The Building,- Replacement Of Roofing,- Replacement Of External Lighting Fittings,- Refreshment Of Internal Walls And Ceilings- Painting And Replacement Of Tiles In Sanitary Rooms,- Accompanying Works. Technical Roof: 43º. Range And Order Of Work. Steep Roof And Attic. Roof Membrane, Impregnation Of Roof Truss Structure, Formwork, Moisture Insulation From Thermosal Felt, Roofing, Installation Of A Metal Roof Tile, Performing The Thermal Insulation Of The Attic Of Mineral Wool Between The Rafters And On The Grate, Laying The Steel Grate On Hangers, Mounting The Foil, Vapor Barrier, Arranging And Assembly Of Guttering, Assembly Of Lightning Protection System, Dismantling Of Scaffolding As Needed, Utilization Of Unnecessary Materials To A Dump With Landfill Costs, Ordering The Construction Site. Elevation: Scaffolding, Dismantling Of Elements From The Facade, E.G. Tablets, Information Plates, Information Boards, Information Boards, Unnecessary Hooks, Lamps, Etc., Vacuuming Deaf Plaster On The Facade, Dismantling Of Window Grilles, Dismantling Of Lightning Protection System From The Walls, Dismantling Of Downpipes, Organizing Electric Cables On The Facade, Remove The Rainwater Approach - Removal Of The Approach To The Building Of The Designed Insulation, Removal External And Internal Window Sills, Disassembly Of Window And Door Joinery, Assembly Of New Windows In The Warm Assembly
|