Scaffolding Work - Rewage Work - Coal Bunker Ensemble - Part Of The Building A+C: Coal Bunker And Coal Mixing System, Grothusstraße 205, 45883 Gelsenkirchen. Static Evidence And Calculations For The Following Scaffolding Constructions. Workshop And Assembly Planning Including Assembly Concepts For The Subsequent Scaffolding Structures. Anchorage Protocols For The Subsequent Scaffolding Constructions. Facade Scaffolding Carbon Bunker (Kbe-A): 150 M2 Clear Of The Scaffolding Areas Of Vegetation, Including Compensation Of Underground Unevenness. 3,815 M2 Facade Scaffolding (Length-Oriented Stand Scaffolding) As A Work And Protective Scaffolding, Load Class 4, Width Class Sw09, Height Class H1, Build Up And Reduce 30 Weeks. 985 M Covering Extensions, Consol Width Up To 25 Cm, Assemble, Hold And Dismantle For 30 Weeks. 235 M Covering Extensions, Console Width Over 25 To 33 Cm, Assemble, Hold And Dismantle For 30 Weeks. 124 M Covering Extensions, Console Width Over 33 To 66 Cm, Assemble, Hold And Dismantle For 30 Weeks. 300 M Covering Extensions, Console Width Over 66 To 100 Cm, Assemble, Hold And Dismantle For 30 Weeks. Install 587 M Of Additional Side Protection On Scaffolding Systems, Hold And Dismantle For 30 Weeks. Mount 127 M Roof Trap Scaffolding For Flat Roof, Hold And Dismantle For 30 Weeks. 3,815 M2 Dust -Dust Scaffolding, Building Material Class B1 According To Din 4102, Assemble, Hold And Dismantle For 30 Weeks. 1 Piece Of Bridging Construction From System Lattice Wearers In Scaffolding, Span Over 5.00 To 6.00 M, Assemble, Hold And Dismantle For 30 Weeks. 1 Piece Of Bridging Construction Made Of System Grille Wearers In Scaffolding, Span Up To 5.00 M, Assemble, Hold And Dismantle For 30 Weeks. 1 Piece Of Two -Day Staircase For Scaffolding, Height Over 33.00 To 34.00 M, Build Up, Hold And Dismantle For 30 Weeks. 3 Pieces Of Two -Day Stairs For Scaffolding, Height Over 27.00 To 28.00 M, Build Up, Last 30 Weeks. 2 Pieces Of Construction Lifts For Passenger And Material Transportation On Scaffolding, Conveying Height 28.00 M, Load Capacity 1,500 Kg, Build Up, Last 30 Weeks. 2 Pieces Of Transition Platforms, Load Capacity 400 Kg/M2, Build Up, Last 30 Weeks. 1 Piece Of Wiping Stage, Load Capacity 400 Kg/M2, Build Up, Hold And Dismantle For 30 Weeks. Room Frames Coal Bunker (Kbe-A): 8 Pieces Of Room Scaffolding (Module Scaffolding With Tipping Spindles) As Work And Protective Scaffolds In 8 Coal Liders, Load Class 4, Height Class H1, Build Up And Disassemble With Work Platforms And Access Platforms. Facade Scaffolding Coal Mixing System (Kbe-C): 86 M2 Clearing The Scaffolding Areas Of Vegetation, Including Compensation Of Underground Unevenness. 1,515 M2 Facade Scaffolding (Length-Oriented Stand Scaffolding) As A Work And Protective Scaffolding, Load Class 4, Width Class Sw09, Height Class H1, Build Up And Reduce 18 Weeks. 253 M Covering Extensions, Console Width Over 66 To 100 Cm, Assemble, Hold And Dismantle For 18 Weeks. Mount 253 M Additional Side Protection On Scaffolding Systems, Hold And Dismantle For 18 Weeks. Assemble 79 M Roof Trap Scaffolding For Flat Roof, Holding And Dismantling For 18 Weeks. 1,515 M2 S
|