Drilling And Construction Of Tubular Wells Perfration And Construction Of Deep Tubular Wells, Including All Equipment, Tools, Inputs And Labor, Depth To 200 Meters, With Coating, Lefaning Test Proven By Iso 17025 And Rbc -Calibrated Meters. Dynamic And Statistic Level As 9Mm Hydrostatic Level Meters To Insert The Head Of The Head Of The Poco Up To 200M. Digital Horimeter To Measure Pump Time Working, Stopped Pump Time. Motobomba Set Supply According To The Flow Produced By The Well. Included The Perforation Authorization And The Granting Request With The Igam., Perforation Of Semiarthosian Wells Perfration Of Semi -Pushes, With A Minimum Depth Of 18 Meters And Maximum Of 40 Meters. Assembly And Disassembly Of Up To 6´´ In Diameter., Cleaning/Disinfection And Maintenance Of Cleaning/Disinfection And Maintenance Of Deep, Semi -Artisian Tubular Wells. With Testing Laboratory Tests Post Cleansing, Reports Of Used Products And Procedures That Guarantee Efficiency In Cleaning., Regularization Of The Artesian And Semi-Artal Wells Regularization Wells, Through The Granting With The Institute Of Water Management Of Minas Gerais-Igam. Abnt Nbr 17076 And Nbr 13969 Standards, Which Deal With The Design, Construction, Operation And Complementary Treatment Units Of Septic Tanks For Local Sewage Treatment. Being The Minimum Sizing Of 600 Liters, Or According To The Number Of Inhabitants Of The Residence. Since The System Does Not Require The Use Of Suction Truck (Leak) For Maintenance. For Sanitary Effluents And Gray Water., 07/21/2025, Construction/Supply And Installation Of Etes Construction/Supply And Installation Of Compact Etes. Biodegradator Project Aims To Implement A Project As A Collective Birreat Solution. The Goal Is To Treat The Domestic Effluent Avoiding Fresh Disposal; Gross In The Existing Water Course, Ensuring Water Quality, Generating Data And Monitoring Effectiveness In The Depollution Of The River And Environmental Preservation. Followed By Careful Biodegrador Installation, Initial And Can Be Modularized Ensuring System Expansion Organicly Without Major Project Impact. Gray Water And Sanitary Effuent, Maintenance And Repair Of Electric Commonges And Repair Of Electric Tubular Post. Command Frames With Contactors, Sustain Or Inverters. Checking Subtentions, Overheating, Power Medication, Outbreak Protectors, Lack Of Phase And Overload Through Thermal. With Bombs Powers Up To 10Hp In Bifasic Or Single -Phase 22Ov. All Parts Included Except Contactor, Sustaining Or Inverter. Panel Supply At 220 V 10Cv For Poco Poco Pocular Poiniel Complete Dim 500X400x300mm With Command And Protection For Pumps Up To 10Hp 220V Bifasic Or Three -Phase. Suction Protection, Overload Protection, Lack Of Phase. Panel Prepared To Function With Concessionara Network Or Photovoltaic Panel., Reading Service And Daily Reading And Filling Service Of Flow, Level And Pump Time Working Through Data Telemetry. Make Available And Feed Spreadsheet
|