|
Construction Work-102-0 Manøvej Overall Plan. Execution Of The Overall Plan For Lejerbos Local Section 102-0 In Næstved: Project Scope Is Shown In The Tender Documents. Below, In Rough Terms, What Is Included In The Project Is Shown. The Following List Is Therefore Not Exhaustive And It Is At All Times The Extent Of Other Tender Material That Applies. -Gables, Blocks 1-8: Renovation Of Gable Facades Is Done With Respect For The Building And Its Archi-Tecture. The Original Classic And Quiet Expression Must Be Preserved. Internal Pre-Set Walls In Gables Are Removed And Surfaces Are Sanated. Walled Gables Are Post -Insulated On The Outside And Shell Walls On A New Foundation And Performed. Incidental Ger. Shell Wall Is Made With New Soft -Grown Stones, Similar To Existing Masonry. - Facade Parties, Block 1-8: Existing Facade Parts Including Windows, Window Sections And Patio Doors Are Replaced With New Incl. Followers Such As Lights, Sole Benches, Joints, Etc. -Exterior Basement Stairs, Blocks 1-8: Adjusting Protection And Support Walls For Exterior Basement Stairs, As Well As Demolition And Re-Establishment Of Stairs. The Work Must Be Performed As A Consequence Of New Masonry And Exterior Post -Insulation In Gable Facades Being Pulled Out Further. - Internal Surfaces In Homes, Blocks 1-8: Partial Replacement Of Wooden Flooring And Foot Moldings, Etc. Partial Replacement Of Fixtures Such As Built -In Cabinets In Entrance. Painting Work Of Walls, Ceilings And Panels/Frames, Etc. - Installations, Blocks 1-8: New Installations For Both Water, Ventilation And Heat Incl. New Radiators. Desu-It Is Carried Out Drains, Drainage Lines, Div Working Ifm. District Heating, Etc. Pipe Boxes Are Carried Out For Visible Piping As Well As Associated Inspection Slem. Some Electricity Works. - Bathrooms, Blocks 1-8: Existing Bathrooms Are Renovated With New Front Walls, Floor Structure, Surfaces, Wet Room Membrane, Tiled And Tiling, Painting, Sanitation And Installations, Etc. - Kitchens, Blocks 1-8: New Installation Works Must Be Carried Out In The Housing Kitchens And In This Connection Existing Kitchen Furniture From The Countertop Height And Down To The Floor As Well As High Cabinets Located In Installation Work Must Be Removed, Stored And Restored. It Is Estimated That 80 % Of All Residential Kitchens Can Be Restored And That 20 % Of The Housing Kitchens Are In Such Poor Condition That Items Cannot Be Reunited, Which Is Why New Kitchens Need To Be Established. A Number Of Older Kitchens Are Also Replaced For Brand New Kitchens. - Basement Ceilings, Blocks 1-8: Visible Insulation Is Performed On The Underside Of Basement Ceilings. - Common House: A Brand New Community House Incl. Construction Work In Terrain. - Free Areas: Changes Of Free Areas, Parking Areas And Road Conditions Are Carried Out As Indicated In The Project Material. Door Phone Systems Are Also Established For All Existing Corridors According To The Project Material.
|