The Subject Of The Public Contract Is To Perform The Construction Work Of The Damage After The Floods In 2024 Under The Name: Repair Of The Administrative Building Of Cm Krnov After The Flood. The Building Concerned Is Used As An Operating Building Of The Krnov Ssmsk, P. O. Realization Time: Date For Completion Of Interior Premises Until 15.11.2025, Deadline For Completion Of External Works Until 31.05.2026. Place Of Performance: Csl. Army 814/27, 794 01 Krnov 1. Data System On The Whole 1. 1Gb/S. The Original Data Wiring On The 1St Floor Was Damaged By Floods. It Is A Universal Design Of The Telecommunications Network, Which Is Independent Of The Computer Technique And Transmission Protocol Used. The Wiring Will Be Made From The Rack Data Switchboard, Which Is Located In Room No. The Wiring Is Made By Paired Utp 6.Cat Cables. The Cables Will Be Stored In A Cable Trough Above The Ceiling. Subsequently All Cables Are Completed On Patch Panels In Rack Rack And In Drawers. Within The 2Nd Floor. The Data Distribution From The Suspension Line Will Be Brought To The Rooms No. 201 (Training Room) And 213 (Dressing Room). The Project Envisages The Electronic Security System Distribution, Which Is Connected To The Central Control Counter In Ostrava. Due To Compliance With The Security Protocol, It Is Proposed To Stretch The Distribution And Elements Of The Ezs With The Contractual Company Trade Fides A.S. This Company Should Revive The System And Connect To The Central Counter Of The Police. The Data System Can Also Be Used For The Operation Of The Camera System. For This Purpose, The Rack In Room No. Wiring The Layout Of Electrical Equipment, Lighting, Main Routes Of Lines, Data Distribution, Security Equipment And Camera System Distribution Systems Are Drawn In The Enclosed Ground Plan Of Electro -Project. In Room No. 108 1. Np Will Be Placed A New Switchboard. On The 2Nd Floor Of A Separate Switchboard, Which Is Connected By A Separate Outlet From The Connecting Cabinet. The Switchboards Are Considered With The Outlets Up. The Main Connection Will Be Carried Out According To The Relevant Standard Cya 4Mm2 (Cya 16 Mm2 Subway Switchboards). With Regard To The Operation Of Computer Technology, Overvoltage Protection Type 1.2 Will Be Installed. The Power Electrical Installation Of Office Equipment Will Be Carried Out Mainly Via Sockets. The Color Design Of The Sockets According To The Appropriate Power Circuit Is Color -Coded On The Ground Plans - Unspecified Outlets In White, Attendance Terminal Green Color, Eps Control Panel, Data Rack And Ezs Control Panel Color And Brown Color Drawers. The Wiring To The Rooms Will Be Divorced In The Ceilings And Will Be Led Out Of The Plaster. The Main Lighting Is Designed With The Installation In The Perspective And Their Location Is Drawn In The Relevant Floor Plans.
Contact Information
Address
Úprkova795/170223Ostrava
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 99209304
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.