Supply Of Evaporating Unit And Split Type Air Conditioning Unit, Capacity 9,000 Btus, Hi-Wall Inverter, Cold Cycle, Reference Brand Elgin, Midea Or Equivalent. 04/07/2025, Capacity 30,000 Btus, Masonry Demolition Of Hollow Elements (Cobogó), Without Reuse, Masonry Demolition, Ceramic Tile Removal, Colonial Type, Including Cumeeiras, Removal Of Polycarbonate Tile, Shielding Of Roofed Wooden Structure, Removal Of Metal Tile, Exclusive Structure, Dismantling Metal Structure Welding Removal And Parts Cutting Through Sander., Electric Points Removal (Luminaires, Switches And Sockets), Disassembly And Existing Qgbt Table Removal, Disassembly And Removal Of Measurement Frame, Removal Of Refrigerated Air Conditioning, Concrete Air, Removal And Replacement Of Plates (Rubberized Floor), Gradis Removal, Gradis, Gradis, Gradis, Gradis. Feeds, Fences And Gates, Removal Of Canvas Awnings For Use, Removal, Recovery, Treatment And Installation Of Existing Metal Gate, Dimensions (1, 00 X 2, 20) M, Pvc Lining With Old Pva Paint For Receiving A New Paint Layer, Pmv Standard Work Plate, In Dimensions Of 2.0 X 4.0 M, Ripple In Galvalume 0, 50Mm White H = 2, 20M, Incl. Estr. Mad. 8X8 (Reuse 2X), Orange Insulation Fences, H = 1.20M, Fixed On Wooden Tops And Concrete Base Every 3M (Considering 2 Uses), Metallic Scaffolding For Façade - Tower Type (Monthly Rent), Monthly Container Rental For Warehouse, Inc. Door, 2 Windows, 1 Pt Lighting, Thermal Insulation (Ceiling), Comp. Painted Naval, Cert. Nr18, Incl. Decontamination Report., Monthly Lease Of Hydraulic Portable Bathroom For Construction Site Conf. Nr18, 24 And 31 - 03 Weekly Maintenance (Waterfall, Toilet With Discharge, Washbasin, Urinal, Toilet Paper, Towel And Liquid Soap, Cap. Cap. 600L, Interconnection System To The Public Sewage Network), Including Mobilization And Demobilization, Temporary Installation Of Water Supply For Measuring, Temporary Installation Of Electricity For The Work, Including Cash Supply For Polypasic Meter And Circuit Breaker, Mobilization And Demobilization Of Leased Work Shed, Assembly And Disassembly Of Tubular Scaffolding Type? Tower?, Tubular Scaffolding Platform Utilization 20X, Vertical Or Horizontal Platform Or Catwalk Movement, Manual 1A Material Excavation. Category, Up To 1.50 M Depth, Apiraled Foundation Of Foundation, In 20 Cm Layers, Price Index For Rubbishing Resulting From The Execution Of Works (Class A Conama - Nbr 10.004 - Class Ii -B), Including Bucket Rental, Loading, Transportation And Unloading In Licensed Area, Supply, Preparation And Application Of Minimal Concrete Of 250 Kg/M3 (Gravel 1 And 2) - (5% Losses Already Included In The Cost), 2.5 X 30.0 Cm Wooden Board For Foundations, Taking Into Account The Use 5 Times (Including Material, Cutting, Assembly, Shoring And Enjoy
|