The Tunnel Consists Of A 420M Mountain Tunnel As Well As The Mass Tunnel In The North At 150M. Inside, The Mountain Tunnel Is Covered With Concrete Elements And Ekberg Vault. The Bulk Tunnel Is Built Of Elements. Main Quantities, Not Exhaustive: • Construction Of A Standard Technical Building With Accident Pocket, As Well As A Smaller Technical Building. • Construction Of Sedimentation Pool Using Spunting. • Excavation Of Approx. 2100 M3 Loose Masses • Removing And Casting New Sidewalks On Both Sides Through The Tunnel • Fry Existing Asphalt, As Well As Laying New Asphalt In The Tunnel And Today Until Roundabout On Both Sides. • Setup Of Two New High Barriers • Setup Of Two New Fire Hydrants To Be Connected To Municipal Water • Technical Upgrading Of The Tunnel According To. The Tunnel Safety Regulations Such As Cable Bridge, Light, Itv, Safety Lighting, Sos, Ups, Cable Guide, Drawbar, Chopped, Redundant Power Supply, Programming.
Contact Information
Contact Person
Nikolai Haugrønning
Address
Statens Vegvesen ,Skoggata 19 ,1500 ,Moss ,Norway
Contact No.
+4722073000
Email
nikolai.haugronning@vegvesen.no
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 98528586
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.