Execution Of The Undertaking Entitled Expansion And Modernization Of The Existing Sewage Treatment Plant In The Village Of Płudy, Trzebieszów Commune, Implemented Under The European Funds Program For Lublin 2021-2027, Measure 3.4 Sustainable Water And Sewage Management (Project Type 1-3) Priority Iii Priority Iii. 1St Degree Sewage Pumping Stations - Renovation And Equipment Of The Existing Pumping Station With New Pumps Pressing Sewage To A Sopiasclator (Assembly 2 Pumps With A Capacity Of Each Min. 20 Dm3/S And Lifting Height Min. H = 7 M Together With Connecting Two Independent Pe 180 Pipelines To The Sitopiascan) Along With Accessories, Oruction, Armature, Tanker Delivery And Assembly Of Phmetr. - Delivery And Assembly Of Separate Containers For Skrakowa And Sand, - Delivery And Assembly Of The New 600 Reactor - Making Reinforced Concrete Elements Of The New Reactor Of The 600, Taking Into Account Technical Parameters (Given In The Technical Design) Enabling Future Installation Of Technological Installations And Preparing The Area For The Foundation And Installation Of Reservoirs Of The New 600 Reactor And The Composer. - Equipment Of The 600 Reactor With Technological Installations, Sections With Pipe Diffusers For Aeration And Sections With Special Mixing Diffusers, Compressed Air Collectors Together With Collectors For Blowers, Air Lifts For Transporting The Sediment Of The Exit Liquid And All Necessary Equipment. Sections With The Possibility Of Pulling Out To Replace The Membranes. Barriers, Stairs And Stainless Steel Technological Installations.- Delivery And Installation Of A Complete 2Nd Degree Sewage Pumping Stations With Proportionally Pressing Sewage To The New 600 Reactor And The Existing 400 Reactor, On The Pressing Pipelines Of Flow Meters With Flow Signaling, Operation Of Sutopiascar And Pumps (Diameter Of The Pump Tank Dn 1500 And Height Min. 3.0 M, Capacity P1 23.5 Dm3/S, Capacity P2 Min Installation Of A Oxygen Probe To Control The Operation Of Blowers With A Signaling Of The Amount Of Oxygen In The Reactor.- Renovation Of Technical Rooms In The Existing Sewage Treatment Plant Building. Installation Of 4 Blowers Of 18.5 Kw, Dandelion Controller, Compressed Air Collectors From Blowers To The New Reactor 600Z By The Possibility Of Cooperation With Dandelions To The Existing 400 Reactor. For Dehydration Of The Sediment With Hygiene Line With Automatic Processing And Dosage Of Polyelectrolyte, Sediment Pump, Electrolyte And Sediment Flow Meter - In/In The Press Used To Drain The Sediment From Stabilization Chambers, Lime Hygiene Conveyor And Silo For Lime (Press Capacity Min. 16 M3/H) .- Constant Construction- Sediment Magazine (Composter Dimensions Length 54 M, Width 14 M, Height 2.41 M, Storage Height 2.2 M). Installation Of 18.5 Kw Powders With An Oxygen Probe Controlled. - Disassembly Of The Existing Roof Structure With Its Reproduction After Mounting The 400 Reactor Tanks- Delivery And Installation Of A Power Generator With
Contact Information
Address
Zakład Gospodarki Komunalnej W Trzebieszowie Sp. Z O. O.,Trzebieszów Drugi,21-404,Lubelskie,Pl815 - Puławski
Contact No.
257960406
Email
zgk@zgktrzebieszow.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 98310244
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.