|
Supply Transport And Settlement Of Plate For The Civil Construction In Galvanized Steel Sheet N.22. Mounted On Wooden Structure According To Pmv Pattern, Equipment Mobilization And Demobilization, Local Administration, High Pressure Jet Surface Cleaning. Af_04/2019, Execution Of Painting With Asphalt Emulsion Rr-2C, For Pavement Construction Works. - (Holes), 06/20/2025, Transportation Asphalt Emulsions Rr -2C, Execution Of Pavement With Asphalt Concrete Application, Bearing Layer - Exclusive Load And Transportation. Af_11/2019, Binder Layer - Exclusive Load And Transport. Af_11/2019, 10 M³ Tilting Truck Transport, In Paved Urban Road, Dmt Up To 30 Km (Unit: M3xkm). Af_07/2020, Additional For Dmt Surplus To 30 Km (Unit: M3xkm). Af_07/2020, Excavation Mecan. Open Field On Earth Except Rock Up To 2M, Load, Maneuver And Discharge Of 10 M³ Tilting Truck - Hydraulic Excavator Load (0, 80 M³ / 111 Hp) And Free Discharge (Unit: M3). Af_07/2020, Grossa Sand - Deposit/Supplier Post (Removed In The Deposit, Without Transport), Regularization Of The Sublice - 100% Intermediate Proctor, Stabilized Sub -Base Granulometrically With Mixture Of Soils On The Track With Deposit Material - 100% Intermediate Proctor, Base Or Sub -Basis Stabilized Granulometrically With Gravel Solo Mixt And Commercial Great - 100% Modified Proctor, Asphalt Emulsion, Double Surface Treatment With Emulsion - Commercial Gravel, Commercial Cover, Diluted Asphalt Cm -30, Rr -2C Asphalt Emulsions, Diluted Asphalt Cm -30, Scraping And Cleaning Of Flat Terrain, Pavement Execution In Parallelepipeds, Grinding With Argama Trace 1: 3 (Cement And Sand). Af_05/2020, Execution Of Pavement On Interlocked Floor, With Rectangular Block Natural Color Of 20 X 10 Cm, Thickness 8 Cm. Af_10/2022, Guide Settlement (Curb) In Curved Stretch, Made Of Prefabricated Concrete, Dimensions 80X08x08x25 Cm (Length X Lower Base X Upper Base X Height). Af_01/2024, Asphalt Pavement Milling (Depth Up To 5, 0 Cm) - Exclusive Transport. Af_11/2019, Cold Micro -Lining With Modified Emulsion With Polymer Of 2, 0 Cm - Track Iii - Commercial Gravel, Partial Demolition Of Asphalt Pavement, Mechanized, Without Reuse. Af_09 / 2023, Maneuver And Discharge Of Soils And Granular Materials In 18 M³ Tillage Truck - Load With Hydraulic Excavator (1, 20 M³ / 155 Hp) And Free Discharge (Unit: M3). Af_07/2020, Base And Or Sub -Base Recomposition For Deep Simple Graded Gravel Patch - Included Withdrawal And Placement Of The Material. Af_12/2020, Execution Of Printing With Diluted Asphalt Cm -30, For Pavement Construction Works, For Pavement Construction Works., Removal Of Granitic Stone Wire, Cobblestone Resettlement, Moscama Rejunction, With Reuse Of Parallelepipeds - Included Withdrawal And Placement Of The Material. Af_12/2020, Mechanized Excavation Of Ditch With Prof. Greater Than 1, 5 M To 3, 0 M (Average And Downstream/A Composition Per Stretch), Excavator (0, 8 M3), Width Up To 1, 5 M, In 1St Category Soil, In Places With High Level Of Interference. Af_09/2024, Mechanized Ditch With Hydraulic Excavator (Bucket Capacity: 0, 8 M³/Power: 111 Hp), Width Of 1, 5 To 2, Deep
|