4.2.1 Part 1-Ratoszyn Intake Dz. No. 457-Replacement Of A 220 M3 Water Tank And Renovation Of The S-1 And S-2 Wells, Plot No. 460/3-Hydrophore Reconstruction, Commune Chodel And Reconstruction Of Water Intakes In Chodel, Gródy, Trzcińiec, Borders And Jeżów, Commune Chodel: I. Ratoszyn Intake Second Plot No. 457 (Wells); Plot No. 460/3 (Hydrophore), As Part Of The Task, It Should Be Done: • Inside The Building Hydrophore: O Installation Of 2Nd Degree Pumping Plants (Hydrophore Set) Of Qii St. = 50 M3/H, H = 4.0 Bar. The Set Consists Of 4 Pumps Of 4.0 Kw Each, Including 1 Is An Active Reserve. Sching And Crowded Collectors: Dn125 Stainless Steel. Damage Inverters Placed In The Closet Of The Set. A Set With Visualization In The Cloud, With The Possibility Of Remotely Changing Phone Numbers For Failure Notifications. Visualization Of The Set In The Existing Monitoring System In Zgkie Chodel, For The Installation Of Health And Safety Devices In The Chloride Room (Safety Shower With A Washer, Washbasin), For Replacement And Installation Of A New Chlorator With An Internal Installation, Overvoltage Of The Existing Installation, • Installation Of A Network Water Meter With A Transmitter Of Impulses (Attachment To The Visualization), • Installation Of The Safety Valve On The Network, • Separation Of The Chloride Room: Partition Wall, Installation Of External Doors In Place Of The Window, • Door Joinery (Internal And External), • Installation Of A New Main Electrical Switchgear, • Modernization Of Internal Lighting Installation, • Modernization Of The Installation Of Force And Sockets, • Replacement Of Electrical And Control Cables Inside The Building, • Execution Of Wall Coverings From Ceramic Plates In Chlorine Plates, Sanitary Hose Hydrophore Hall And Terracotta Arrangement, • Removal Of Plaster Defects On The Walls And Possibly Forging Unevenness And Re -Plastering, • Painting And Finishing Works Inside The Hydrophore, • Replacement Of Hydrophore Fence As Well As A Well And An Expansion Reservoir Area, • Execution Of A Building Band And An Entrance To The Hydrophore Area Of Cobblestones, • Replacement Of The Expansion Tank With Capacity. 220M3 Together With The Foundation, • Replacement Of The Pipelines Between Work: Well-Gutter, Hydrophore Reservoir With Fittings And Control Cables, • Control Cable For Deep Pumps From The Controller Of The Hydrophore Set, Cable From Probe And Swimming Tank Floats For The Hydrophore Set Controller, • Replacement Of Concrete Enclosures Of Wells, Pumps, Pumps. Deep -Sea, Fittings And Pipelines With Well Filters, • Hydrophore Alarm Installation, Wells Of Wells. Ii. Water Intake In Chodl - Journal Of Laws No. 1208, As Part Of The Task Should Be Done: • Inside The Building Hydrophore: For Installation Of New Equipment In The Sanitary Node Hydrophore (So -Called White Installation), For Installation Of 2Nd Degree Pumping Plants (Hydrophore Set) Of Qii St. = 38M3/H, H = 2.5 Bar. Sching And Crowded Collectors: Dn100 From Sta
|