1. The Subject Of The Order Is The Construction Of A Playground Along With Accompanying Elements Of Land Development As Part Of The Investment Task For The Mikołów Commune Called: Park Of Three Generations - 3Rd Stage - Playground. The Scope Of The Order Covers The Area Between The Streets Of Ludwika Musioł, Podleska And The Norwida Estate In Mikołów. Plot Registration Numbers In The Development Area: 2436/175, 2449/162.2. The Scope Of The Order Includes The Development Of The Recreation Area With Playground Equipment, Green Plantings, Pedestrian Routes, Small Architecture Elements And Accompanying Infrastructure. 3. The Works Should Be Carried Out In Accordance With The Attached Project Documentation. Documentation Has A Building Permit No. Rdpb-0689/2024 Of 03.12.2024 4. The Scope Of The Order Covers Its Scope In Accordance With The Design Documentation: 1) Dismantling Of Existing Playground Devices, 2) Disassembly And Utilization Of Existing Surfaces, 3) Liquidation And Utilization Of Remains Of Walls Through Their Demolition, 4) Cutting Off A Tree That Does Not Require Felling Permit (Black Alder), 5) Execution Of Newly Processed Communication Routes In The Aquotrous Mineral Surface, 6)) Making Playground Fields In A Safe Water Surface, 7) Assembly Of Playground Devices - Newly Designed And Dismantling, 8) Renovation Of Existing Off -Road Stairs, 9) Fence Of The Area From The Side Of Podleska Street10) Installation Of Elements Of Small Architecture Such As Benches, Bicycle Racks, Garbage Bins, Shading Sails, Watering Pool, 11) Drink And Spraying Water Column, 12) Planting Of The Designed Green, 13) Execution Of The Area Of The Area, 14) Terrain Monitoring, 15) Developing As -Built Documentation, Which Includes: A) Project Documentation With The Changes Made In The Course Of Works (As -Built Project) - 2 Kpl. In Paper Form And 1 Item In Electronic Form (Cd, Pendrive); B) Original Approvals And Certificates Confirming The Admission To The Use Of Building Materials Used During The Performance Of The Order, Elements Of Fixed Equipment Finishing - 1 Set; C) Delivery Of A Document From The Inspection (So -Called Control Of The Control Playground After Modification Of The Playground And Surface. With Pn-En 1176 And 1177 Standards. The Inspection Document Should Be Made By A Competent Person In This Respect-2 Set; D) Instructions, Descriptions And Copies Of The Warranty Cards Of Devices Mounted As A Result Of Works-2 Set; E) As-Built Geodetic Maps Together With The Assembly To Geodetic Resources. Cover! Protected Equipment, Equipment And Materials Must Be New. 5. The Full Range Of Design Work Is To Be Consistent With Swz, Attachments To Swz - Design Documentation And Stwiorb.6. It Is Recommended To Make A Local Vision By The Contractor And Clarify All Doubts To The Tender Documentation At The Stage Of The Tender Procedure. 7 A Detailed Description Of The Subject Of The Contract Was Specified In The Tender Documentation, Including Stwior, Opz, Which
Contact Information
Address
Gmina Mikołów,Mikołów,43-190,Śląskie,Pl22c - Tyski
Email
zamowienia@mosir.mikolow.eu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 97510859
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.