5.1. The Subject Of The Contract Is The Investment Task: Reconstruction Of The Forest Road Section 280.0 M Per Journal Of Laws 26 In L. Nanice In The Wejherowo Forest District, Including The Performance Of All Works Leading To The Achievement Of A State In Accordance With The Design Documentation, Technical Specifications Of Execution And Receipt Of Construction Works, Swz And The Provisions Of The Public Procurement Agreement. Common Dictionary Of Orders (Cpv): 45111200-0 Robots In The Preparation Of The Area For Construction And Earthworks45233120-6 Works In The Field Of Road Construction5.1.1. Scope Of Work: Reconstruction Of The Section Of The Forest Road 280 M Long, Which Includes: • Execution Of Preparatory Works (Including The Construction Of The Construction Site): Before Starting Works, The Work/Design Scope In The Field Should Be Geodetic And All Noticeable Discrepancies Should Be Explained Directly With The Appointed Supervisory Inspector Or The Contracting Authority. Preparatory Works Mainly Refer To Works Related To The Protection Of The Area Of The Reconstructed Road For The Duration Of The Works. The Contractor Will Develop And Agree On The Plan And Form Of Action With The Employer. The Contractor Is Obliged To Secure The Area Of Works Against Access By Third Parties. However, Access To Forest Areas Should Be Enabled To The State Forests Administration Services And All Relevant Services (Police, Guard, Ambulance), Through The Proper Stage Of Works. The Scope Of Preparatory Works Also Includes Robots Related To The Removal Of Collision Trees (On The Side Of The Contracting Authority) And Carp (On The Side Of The Contractor) Located On The Reconstructed Road (Collision) Along With Loading, Detection And Heaps In Place Designated And Indicated By The Contracting Authority. Road (Including Expansion Of Excavations, Gorges, Leveling Of Elevations)- Superficial Corners In Order To Remove The Lying Donation- Profiling And Stinging The Ground For The Construction Of The Road- Profiling Of The Slopes, Substrates For Structural Layers To The Values Assumed In The Project • Dehydration: Rainwater/Rainwater In The Investment Range Will Be Discharged With Surface Tightenings With The Help Adjacent To The Road In The Field Of A Plot In The Investors Management. The Mdcp Obtained From The Surveyor And The Online Resource Of Available E-Map Also Does Not Show Underground Networks In A Given Range Of Planned Works. However, Due To The Potential Possible Network, Especially Within The Existing Connectors, Construction Works Should Be Carried Out With Particular Caution And Earthworks Within A Given Area Should Be Carried Out Manually And Under Constant Supervision Of Authorized Persons. Control Diges Should Be Carried Out To Locate Any Networks And Protect Them For The Time Of Conducting Road Works (If You Need To Secure The Network Permanently, Follow The Conditions Indicated By The Gestor Of A Given Network • Construction Works: - Making The
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 97510832
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.