5.1. The Subject Of The Order Is The Investment Task: Reconstruction Of The Forest Road Section Of 50.0M Per Journal Of Swz And The Provisions Of The Public Procurement Agreement. Common Dictionary Of Orders (Cpv): 45111200-0 Robots In The Preparation Of The Area For Construction And Earthworks45233120-6 Works In The Field Of Road Construction5.1.1. Scope Of Work: Reconstruction Of The Section Of The Forest Road, Which Is Expected To: • Performance Of Preparatory Works: Before Starting The Works, The Work/Design Scope Should Be Geodetic And All Noticeable Discrepancies Should Be Explained Directly With The Cited Supervision Inspector Or The Contracting Authority. Preparatory Works Mainly Refer To Works Related To The Protection Of The Area Of The Reconstructed Road For The Duration Of The Works. The Contractor Will Develop And Agree On The Plan And Form Of Action With The Employer. The Contractor Is Obliged To Secure The Area Of Works Against Access By Third Parties. However, Access To Forest Areas Should Be Enabled To The State Forests Administration Services And All Relevant Services (Police, Guard, Ambulance), Through The Proper Stage Of Works. The Scope Of Preparatory Works Also Includes Robots Related To The Removal Of Collision Trees (On The Side Of The Contracting Authority) And Carp (On The Side Of The Contractor) Located On The Reconstructed Road (Collision) Together With Loading, Detection And Noise In The Place Designated And Indicated By The Contracting Representative. Area In Order To Bring The Road Crown To The Designed Profile (Including Expanding Excavations, Gorges, Leveling Of Elevations, Reproduction And Denying The Reservoirs/ Protruding Tanks For Rainwater And Roadside Ditches/ If They Occur) • Superficial Cornering To Remove The Donation • Profiling And Embellishing The Substrate Under The Construction Of The Road • Profiling Of The Slope Construction Expansion To Values Assumed In The Project. The Project Involves The Inclination Of The Slopes In The Excavations, On The Embankments And In The Ditches In A Ratio Of At Least 1: 1.5 / Recommended 1: 2 And The Compaction Of The Substrate Under The Construction Of Construction To The Value Of Is³1.00. Dehydration: Rainwater In The Investment Field Will Be Discharged Surface With Longitudinal And Transverse Slopes To Adjacent / Green Areas To The Road And To Existing Reservoirs / Pits Of The Protruding - Evaporating And Ditches After Their Earlier Dismantling And Partial Reconstruction (If They Occur In A Given Location). Devices Of Underground And Overhead Networks: The Project Does Not Include Construction Of New Underground Networks And Alert Networks In The Investment Range. The Obtained Mdcp From The Surveyor And The Internet Resource Of Available E-Map Also Does Not Show Underground Networks In A Given Range Of Planned Works. However, Due To The Potential Possible Network, Especially In The Initial Km Of Road, Construction Works Should Be Carried Out With Particular C
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 97510807
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.