The Subject Of The Contract Is The Execution Of Construction Works To Increase The Energy Efficiency Of The Branch Of The Cultural Building In Jelna.1) The Building Characteristics: It Is A One -Story Building, Not Basement With A Non -Usable Attic, Free -Standing. Wooden Walls, A Wooden Ceiling, A Gable Roof With A Wooden Structure With A Decrease In The Main Slopes 71.5% (36 °) And Roofs Perpendicular To The Main Roof Ridge For The Added Part (Shelter With The Stage) With A Decrease In 70.5% (35 °). The Building Is Located On Plot No. 431 In The Town Of Jelna (Village Council Judasówka). Built -In Surface (Entire Building) -213.16 M2 Use Surface (Entire Building) -183.43M2kubatura (Entire Building) -987.00 M32) The Scope Of Construction Works Provided For Construction Includes: Attic (Strengthening Of The Ceiling, Horizontal Insulation With Mineral Wool 16 Cm +6 Cm - 122.610 M2 With Insulation With Vapor -Tight Polyethylene Foil), • Insulation Of External Walls (Thermal Insulation And Anti -Anti -Mineral Vertical Wool From 2X 8 Cm Vertical Wool Polyethylene, Wooden Grate, Installation Of A Facade Board From Wooden Slats Gr 3 Cm Grades Up To 12 Cm - 165.541 M2), • Installation Of Window Joinery (Installation Of Open And Tilted Windows And Tilted Uniform With Pvc With Pvc With Processing - 11.74 M2), • Installation Of Window And Door Stool (Aluminum Door (Aluminum Door Two -Leaf - 4.60 M2), • Modernization Of The Heating Installation And Hot Utility Water Installation, Air Pump Installation - Water, Modernization Of Internal Heating Installation, • Installation Of A 9.00 Kw Solar Installation, • Assembly Of Mechanical Ventilation Devices With Recuperation (Ventilation Control Panel With Heat Recovery V = 600-850 M3/H). And Making A New Floor In The Building Together With Insulation From Eps 100-038 Foil And Boards And Sewage System Installations In The Inspector, • Finishing Vinyl Floor Panels And Stoneware Tiles. - 114,070 M2, (Non -Eligible Expenses). Specific Scope Of Works In Accordance With The Attached Bill Of Quantities And Developed Project Documentation. 3) In Each Case Of Use In The Description Of The Subject Of The Order Of Norms, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Para. 1 Point 2 And Para. 3 Of The Public Procurement Law, The Contractor Should Assume That Such As Or Equivalent Words Harmonized, Technical And Construction Conditions, Health And Safety Regulations,- Applicable Provisions Of The Act Of 7 July 1994 Construction Law (Journal Of Laws Of 2024, Item 725, As Amended), Hereinafter Referred To As The Construction Law And The Act Of 16 April 2004 On Construction Products (Journal Of Laws Of 2021) Hereinafter Referred To As The Act On Construction Products,- Executive Provisions To The Abovementioned Acts,- The Provisions Contained In The Draft Contract, Which Is Annex 3 To Swz,- Declaration Of Ce (Conformité Europénne),- Technical Knowledge And Construction Art;
Contact Information
Address
Gmina Nowa Sarzyna,Nowa Sarzyna,37-310,Podkarpackie,Pl824 - Tarnobrzeski
Email
zamowienia@nowasarzyna.eu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 97295129
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.