The Subject Of The Contract Is The Provision Of Service And Removal Of Street, Park, Illumination Lighting Failures In Tarnów On A Network Owned By The Municipality Of Tarnów And Covers The Following: 1) Conducting 24 -Hour Duty (Also On Non -Working Days, Sundays And Holidays), Consisting Of: A) Daily Tracking Of Information From The Cpanet System Monitoring The Work Of Street Lighting, B) Lighting Damage, C) Securing The Place Of Failure And Devices Until Repair, Removal Of Threats Arising As A Result Of Lighting Damage And Protection Of Elements Against Further Damage, D) Removal Of Failures And Damage Not Covered By The Scope Indicated In § 2 Para. 3 Of The Planned Provisions Of The Contract (Annex 2 To Swz), 2) Performing Activities And Fulfilling The Obligations Specified In The Operating Instructions, In The Parts Cited Below: A) General Rules For The Operation Of The Street Lighting Network, B) Rules For Conducting Current Operation And Maintenance Of Street Lighting, Excluding A Group Exchange Of Light Sources, Checking The Foundation And Restoration Lighthouse Foundations, Supplementing Columns Numbering, Painting Pillars With Anti -Corrosive Paint. The Excluded Excluded Activities Are Included In The Extent Specified In Para. 3 Of The Contract, C) List Of Activities Related To The Operation Of The Operation Of Street Lighting Devices In Conditions Of Normal Operation - Inspection And Ad Hoc Work, 3) Starting Street Lighting After Failures, 4) Replacement Of Damaged Power And Control Elements As Well As Fuses, 5) Removal Of Lighting Defects, Including: Liquidation Of The Short -Circuit On Lighting, Circuits, 6) Maintenance Of Lighting Wardrobes, Including Wardrobe Repair After Damage, 7) Recognizing The Causes Of The Failure, Control And Checking On Power Reducers, Controllers, Lighting Cables, Fittings, 8) Dismantling Of Damaged And Assembly Of New Power Reducers (New Devices Are Provided By The Contracting Authority), 9) Establishing And Conducting Sealing Logs, Facilities, Facilities And A Journal Of Work And Emergency Work. In Which All Activities Resulting From This Contract Will Be Described (Along With The Determination Of The Device On Which The Work Was Carried Out). Designs Of Facilities Book, The Examination Of The Inspection And Journal Of Emergency And Emergency Works Have Been Attached To The Operating Instructions, 10) Ensuring Constant Wireless Communication In The Gprs System Cabinets With Cpanet Control Cabinets, Taking Care Of The Correct Operation Of The System From The Physical Side, Including Replacement Of Battery In The Controllers (The Contractor Does Not Bear The Costs Of Subscription Fees For The Drivers And Maintenance Costs Server), 11) Sharing Of Street Lighting Networks And Devices To Other Contractors At The Request Of The Employer For The Purpose Of Expansion, Reconstruction, Modernization, Warranty Repair Or Lending The Connection For Occasional Events, Etc., 12) Maintenance Of Sockets Installed On Ligh
|