- The Subject Of The Public Contract Is The Construction Work Of The Existing Building With A Conversion To The Class Of A Childrens Group With A Capacity Of 12 Children With Facilities. The Entrance To The Building Is Existing, Barrier -Free. The Space For The Childrens Group Is Located On The 1St Floor In The Place Of The Current Municipal Office. In The Entire Area Of The Area On The 1St Floor There Will Be A Demolished Floor And A New Composition With Proper Insulation. Central Space - Stay Room Of Children - Playroom/Bedroom/Dining Room Will Create Existing Partitions And Walls. The Playroom Is Oriented To The Southern Direction And Is Connected By Newly Demolished French Windows With A Private Terrace In The Courtyard. On The Terrace There Will Be A Built -In Sandpit And A Solitary Tree. The Terrace Will Be Connected To The Yard With An Outdoor Leveling Staircase. The Edge Of The Terrace Will Be Equipped With A Belt Steel Railing. The Interior Layout Of The Childrens Group Is Based More Or Less On The Existing Layout - The Entrance To The Childrens Group Is From The Vestibule Of The House To The Central Corridor, All Facilities Of The Ds Are On The Northern Facade (Oriented To The Street), On The Contrary, The Playroom Is Oriented To The South Court. At The Entrance There Is A Dressing Room That Follows The Childrens Toilet, From The Corridor Is Also Accessible Employee Facilities - Office/Dressing Room With Toilet, Cleaning Chamber And In The Back Of The Kitchen, Where New Doors On The Facade For Easier Supply. The Kitchen Will Serve As A Dispenser Of Meals. Meals Here Will Be Imported, For Example, From The Kitchen Of The Local Childrens Home Or From The Kitchen Of The Elementary School In The Neighboring Village. The Kitchen Is Connected With A Dispensing Window To The Dining Room In The Childrens Playroom. In The Attic Is Also Designed Art Workshop For The Needs Of The Childrens Group. It Consists Of A Central Room With A Sink And Sink For The Needs Of The Workshop. The Childrens Group Is Connected To Central Wiring, Heating Will Be Left In The Housing And New Floor Heating In The Playroom. The Whole Building Is Heated By The Existing Gas Condensing Boiler Located On The 2Nd Floor. Dhw Preparation Will Be Ensured In An Indirect Heating Tank With A Capacity Of 150L, Which Will Be Heated By Heating Water From The Gas Boiler. Throughout The Ds Space Will Be Fitted With New Lining Interior Doors, The Walls Will Be Plastered, Walls On The Toilet/Bathroom, Cleaning And Kitchens Will Be Lined With Large -Format Ceramic Tiles. The New Floor Covering Will Be A Natural Linoleum, In Wet Operation Ceramic Tiles. The Newly Established Premises For The Childrens Group Will Be Equipped With High -Quality Furniture Corresponding To The Designed Use (Childrens Wooden Furniture, Game Elements, Storage Elements For Toys, Art, Sports Equipment, Bedding, Etc.). The Pd Is Processed According To The Applicants Assignment And Request, With A Detailed Specification And Extent Of The Work To Be Detailed In Detail, Detailed By The Project Documentation Prepared By 09/2017 Ing.Arch. Kateřina Grohová, Responsible Designer, Ičo: 726 92 995 Čka 4200.
Contact Information
Address
Ledce1727305Ledce
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 96987488
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.