Underground Work Other Than Tunnels, Shafts And Subways-Civil Engineering, Coating Settings-Construction Medice Of The Bundeswehr, Elb-Havel-Barracks, New Werkhalle (Nsb 245-25). Civil Engineering, Converting Lines: • Make The Pipeline M. Make Shaft Construction Trenches 1,770M³ • Make The Shaft Ditch With Shaft Construction Trenches 1,760M³³, • Make Installation Ditch 1080M³ +, • Material, In Line Ditch. 3,135M³, • Make The Assembly Pit, Head Hole Up To 5M³, • Make The Assembly Pit, Head Hole Up To 5-10 M³ • Making Shaft Construction Pits. Profile. Loosen 230M³ • Intermediate Transport And Storage Of Installable Soil 110M³ • Select And Cover The Top 65M³, • Make The Construction Pit 12 Pc • Pressure In The Ground Displacement Procedure 60M • Prefabricated Shafts • Produce Plastic Pipes 140M Plus Shape, • Make -Up Shaft Connection Dn 200 • Conduct The Pipe. Pump Sump 100M, • Execute Camera Experience, • Drinking Water Pressure Tube Pe 100 Rc 125M, • Preparation For Commissioning • Inner Pressure Testing, • Make Cable Pulling Shaft From Sb, • Cable Protection Tube Da 800M, • Make Cable Pulling Shaft From Sb, • Concrete Fastening. • Record Curbs 50M, • Cancel The Drainage Tube Tube 150M+170M, • Cancel 450M District Heating Tube Ripen, • Separate The Pipeline Stoneware, • N.Färl. Floor Between. Emerged. Bm-0 Disposal 1220M³, • N.Därl. Floor Between. Emerged. Bm-F0 Disposal 1220M³, • N.Därl. Floor Between. Emerged. Bm-F0* Disposal 1220M³, • Declaration Analysis Soil According To Ebv 7 Pc, • Intermediate Storage Ebv, • N.. Ebs From Between. Emerged. Rc-1 Disposal 132M³, • N.Därl. Ebs From Between. Emerged. Rc-3 Disposal 132M³, • Lay Geotextil As A Separator Layer 875M², • Deliver And Install The Building Material, Resume 0/22 To 0/32 180M³
|