1. The Scope Of The Subject Of The Contract Includes In Particular: 1.1. Demolition Of Existing Objects And Cutting Out A Part Of The Greenery: Excision Of A Part Of High And Low Greenery With A Designed Building, The Existing Building Of The Village Common Room (It Is Allowed To Leave Fragments Of The Existing Wall Of The Common Room Building In The Structural Axis No. 6 And Their Connection With The Designed Wall, If Such A Technical Possibility Is Confirmed At The Stage Of Construction Works, By All Installations) Internal, Tin Garage Placed On A Concrete Plate (Disassembly In A Non -Destructive Manner And Charging In Place Indicated By The Contracting Authority), A Concrete Ramp For Disabled People Along With A Steel Handrail, Concrete External Stairs Leading To The Main Entrance, Concrete Platform Located At The Exit From The Room Of The Common Rooms, Sidewalks And Reaching The Building Of The Village, The Building, Made Of A Cobblestone Concrete Cube, Reinforcements At The Entrance, A Steel Bicycle Stand (Dismantling In A Non -Destructive Manner And Covering In The Place Indicated By The Contracting Authority), Table Tennis Table, Made Of Lastriko (Dismantling In A Non -Destructive Manner And Charging In The Place Indicated By The Contracting Authority), A Wall Made Of Concrete Blocks Stop, Entrance Pavement To Plot No. 331/2, Part Of The Steel Fence With A Gate And Gate. 1.2. Demolition Of Existing Installations: A Fragment Of The Water Connection, External Sections Of The Internal Sanitary Sewage System With Concrete Studies. 1.3. Zero Condition. Foundation Of Reinforced Concrete Foundation Benches On A Layer Of Lean Concrete, Morals Of Foundation Walls From Concrete Blocks On Cement Mortar, Vertical And Horizontal Waterproofing On Erected Benches And Concrete Foundation Walls, Vertical Thermal Insulation Of The Foundation Thermal Insulation From The Outside With The Outside With The Outside Reinforcement With Mesh And Glue And Mechanical Cover From Drainage Foil, Installation In The Excavation Next To The Foundations Of The Rim Eaves, Distribution Of The Internal Sewage System With Exit And Supplying The External Installation (Along With The Wells And The Fat Separator) To The Attachment Well At The Plot Border, Covering The Excavations With Sand And Density Made Overflow, Making A Concrete Undercoat On A Concentrated Sand Layer. Employer Signs: All Materials Used To Perform The Subject Of The Contract Must Be In The First Species And Must Have Approvals, Certificates And Technical Approvals Allowing For Use In Construction (Certificates And Approval Attestations Should Be Provided To The Ordering Party); Payment For Completed Robots - One -Time Payment Up To 30 Days From The Date Of Submission Of A Correctly Issued Invoice To The Contracting Authoritys Account. For Works Covered By The Subject Of The Contract, The Contractor Will Guarantee For A Minimum Period Of 3 Years (Maximum 5 Years) From The Date Of The Final Acceptance Report. Th
Contact Information
Address
Gmina Namysłów, Reprezentowana Przez Burmistrza Namysłowa,Namysłów,46-100,Opolskie,Pl523 - Nyski
Email
zamowienia@namyslow.eu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 96376217
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.