Engineering Design Services For Mechanical And Electrical Installations For Buildings – Erweiterung Burgschule Tga Ii. The Services To Be Achieved Include The Performance View Of Technical Equipment, § 55 Hoai, Plant Groups (§ 53 Hoai): 4. Large Current Systems, 5. Telecommunications And Information Technology Systems, 6. Funding Systems, Eligible Costs (From Cost Group 400, Din 276) In Accordance With § 54 Hoai Approx. 759,938.88 Eur (Shares Of The Plant Groups: 4 = 76.47 %, 5 = 11.76 %, 6 = 11.76 %). The Castle School Is A Full-Day 3.5-Day Primary School On The Way To The Pact For All Day. In Addition, 2 Intensive Classes Are Trained At The Castle School. The Support Rate Of School Childcare There Is Currently Around 70 %. The School Currently Has 13 Classrooms, In Addition, The Pc Room And The Workroom Can Also Be Used As Classrooms By Conversion. The School Has Increasing Number Of Students And Four Smaller Construction Areas Are Implemented In The School District, Which Increases The Schools Classroom Needs In Perspective 15 Classes. The Castle School Does Not Have A Cafeteria, Which Is Why The Students Use The Canteen Of The Neighboring Freiherr-Stein School. The Canteens Capacities Are No Longer Sufficient, So That Other Children Use A Second Temporary Meal Edition In The Basement Of The Castle School. In Perspective, Other Food Places In The School Kitchen Of The Freiherr-Vom-Stein School Must Be Generated. Both Issuing Offices Are Permanently Associated With Increased Organizational Effort And Not To Be Required In Perspective. In An Internal Feasibility Study, It Was Determined That A Structural Expansion With Approx. 1,060 M² Hnf Can Create The Required Spatial Capacity For A 4-Day And Modern Pedagogical School Concept As Well As 100%Care At The Location. In The Extension Building, A Cook And Chill Kitchen With Cafeteria As Well As Care Rooms And Classrooms Are Housed. The Extension Is To Be Built And Promoted In A Passive House Standard. The Standards Of The Main-Taunus Circle Must Be Observed And Planned. Tga: It Is Planned To Install A Cistern For The Rainwater That Is To Be Used For Toilet Flushing. A Photovoltaic System Is Built On The Roof. The Heat Supply Takes Place Via The Existing Gas Condensing Boiler With Chp In The Old Building. It Is To Be Planned To Plan A Central Ventilation System. The Rooms Are Provided With Individual Room Control. The Classrooms Receive Sinks. The Measure Is Carried Out During Operation And Must Be Planned In Such A Way That School Operations Can Continue. The Specified Contract Term Only Represents The Currently Estimated Duration Until The Construction Work Is Completed And Also Includes The Optional Service Phases Up To And Including 9, § 55 And Annex 15 No. 15.1 Hoai.
Contact Information
Address
Am Kreishaus 1-5
Contact No.
+49 6192201-6142
Email
hochbau-vergabe@mtk.org
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 96067825
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.