1. General Information The Subject Of The Contract Is The Modernization Of The Xxxix High School At Ul. Zuga 16 In Warsaw, In Accordance With Design Documentation Developed Under The Name Roof Renovation Xxxix High School At 16 Zuga Street, Consisting Of An Architectural And Construction Design, Based On Which Decision No. 54/Bie/Pb/2025 Was Obtained Building Permit (Annex No. 10 To Swz) As Well As A Technical Design And Technical Specification Of Execution And Acceptance Of Construction Works Developed 6.12.2024 By The Engineering Office - Antosik. The Contracting Authority Attachments Together With The Design Documentation The Bill Of Quantities, With The Proviso That It Is An Exclusion Of An Auxiliary Document That Can Be Used To Quote The Offer. 2. Location (Investment Address): Dz. No. 72/1, Precinct 7-05-05Ul. Zuga 16, 01-806 Warsaw3. Characteristic Parameters Determining The Scope Of Construction Works- Roof Area Of The Main Building 1250 M2- Roof Area Of The Gym Building 240 M2- Number Of Strap Of Eyes To Replace 15 Pcs. 4. The Subject Of The Contract Includes:- Development Of A Material And Financial Schedule;- Development Of A Project Of Organizations Taking Into Account Works During The Functioning Of An Educational Institution;- Development Of A Safety And Health Protection Plan;- Execution Of Assembly And Construction Works On The Basis Of Project Documentation Including: • Replacement Of Roofing In The Form Of A Tile (Roofing Replacement) Along With The Appropriate Ventilation In The Pounding Level, • Replacement Of Roofing, • (Patches And Counterbalances), • Replacement Of Old Roofing Felt On The Membrane Sheathing Boards, • Replacement Of The Roof Sheathing Of Boards, • Cleaning And Impregnation Of The Truss Along With The Replacement Of Corroded Structural Elements Of The Truss, I.E. Parts Of The Rafters, Bars, Swords, Foundations, Walls, Etc., • Correction Of The Rafter System At The Chimneys, • Replacement Of All Ticks Or Insertion Of Insulation (Cutting Layer) Under The Foundations And Muffins, • Replacement Of The Roof Hatch In The School Pavilion And Installing The Roof Hatch In The Roof Of The Gym, • Replacement Of Flashings For Processing From Zinc And Tin Metal Sheet Metal, Along With The Leveling Of The Surface Of The Cornice, • Replacing The Orinning And Trigger Pipes, Along With The Replacement Of The Windows, • Enclosure Of Rafters And Roofing From Below With Gkf Plates To Ensure The Required Fire Resistance R30 And Re30, • Replacement Of Chimney Sweep Benches With New System Tile Color And Bringing Benches Or Chimney Steps To All Chimneys, • Execution Of New Lightning Systems Along With The Replacement Of Destroyed Vertical And Mounted Vertical Saps And Mounted In The Ground Of The Zbile, • Renovation Of Brick Chimneys, Bricking The Other Holes, Repairing Plasters And Hats, Installing Protective Nets On Chimneys Holes, Mounting Hats On The Hole Of The Upper Chimneys, • Renovation Of Metal Chimneys, Making Chimney
|