|
Motor Vehicles - Truck Purchase With Adapters. Twenty -Four (24) Pieces Of New Condition - Not Previously Launched, Detailed In The Technical Description (Technical Compliance Declaration), Is The Same Made And Designed, N3, A Heavy Truck, And All Lorries Associated With A Truck Adapter, Wheel-Form, Tilting, N3 Category, Municipal Hydraulic Truck (Euro 6 Environmental Ratings), Snowfall And At Least 4M3 Solids); - 10, At Least 25 Tonnes, 6X4 Wheel Formula, Tilting, N3 Category, Municipal Hydraulic Truck (Euro 6 Environmental Ratings), Snowfall And At Least 4M3 Solids); - 4 Cranes, At Least 25 Tonnes Of 6X4 Wheel Formula, Tilting, N3 Category, Communal Hydraulic Truck (Euro 6 Environmental Rating), Telescopic Snow And At Least 4M3 Solids). The Exact Description And Technical Requirements Of Heavy Trucks And Adapters Are Contained In The Technical Description (And Draft Contract) Issued As Part Of Public Procurement Documents. The Successful Tenderer (Seller) Is Required To Sell Heavy Trucks And Adapters To The Contracting Authority And Dispose Of Them. The Performance Locations Are Included In The Annex To The Draft Contract. The Successful Tenderer (Seller) Is Required To Provide The Contracting Authority With A Valid Traffic License, With A Valid Traffic License, A Registered Mark On The Market, With A License Plate, A License Plate, With A Technically Examined, License Plate, And Are Required To Provide All Documentation And Certification Delivered Lorries Must Meet The Hungarian And Eu (Un (Egb) International Standards, Regulations And Security Requirements (Eu (Egb). The Successful Tenderer (Seller) Is Responsible For Building, Coordinating, Commissioning Heavy Trucks And Adapters, And Transporting To The Places Provided By The Contracting Authority (Buyer). Furthermore, The Training Of Managers Safety, Management And Daily Maintenance Training For At Least 2 People Per Truck, At Least 4 Hours Per Venue, At A Maximum Period Of 6 Hours At The Same Time As The Truck. The Technical Description (Technical Compliance Declaration) Which Is The Subject Of The Procurement Is Contained In Detail In Other Public Procurement Documents. Contracting Authority Draws The Attention Of Economic Operators To Possibly In Public Procurement Documents
|