|
Cutting The Bushes And Gorgeous Grandsets With Colands And Grooms On The Tractor In The Tractor In The Natural Sleeping Soils, 79 (108) Kwh (108) Kols And Gorgeous Grids, Drilling With Bulldozers By Transporting The Ground To A Distance Of 10 M: 59 (80) Kw (A.G.), Group 2 Group Ground, To Add To The Time Of The Next 10 M Shipment Of Ground: (Annex 20 M), Establishment Of Channel And Dams With The Population Of The Clique With The Capacity Of 0.25 M3, Group Of Group: 2 (Drilling Of A Temporary Channel With The Repair Of The Existing Channel), Drilling With Bulldozers By Transporting The Ground To 10 M, Bulldozer Strength: 59 (80) Sq T (A.G.), Group 2 Ground (Smoothing), Chalovs Capacity With 0.25 Ni3 Is The Establishment Of Damps With Excavators, Group Of Group: 2 (To Correct The Form Of An Existing Channel), Hand By Group, Group, Group: 2 (After Excavator Work) In Ground Trenches To 2 M, Hand Planning Of The Bottom And Slopes Of Ducruged Places, Group Group: 2, Set The Basics Of Six Basic Foundations, The Thickness Of The Bottom And Slopes With Monolithic Reinforced Cranes With 16 T-Luced Cranes, Thickness Of Hardness: 0.2 M (B125, W4, F50), Closing Of Seams In The Fastening Of The Slopes Of The Slopes Of The Cannons: With Hot Bitumen-Polymer Mastic, Drilling With Bulldozers By Transporting The Ground To The Distance 10: 59 (80) Kwh: 59 (80) Kw (A.G.), Group Group (Charging The Temporary Channel After Repairs), Smoothing Of The Grounds Of The Ground To The 10Th Place Of The Ground, The Power Of Bulldozers: 59 (80) Kw (A.G.). Group 2 Ground (Spreading Plant, Addition Of The Soil During The Next 10 M Displacement Of The Ground: (An Additional 20 M), Steel Water Pipeline, Withdrawal Of Hydraulic Testing, Pipeline Diamaniet: 800 Mm (Unusable D = 820X9 Mm Metal Pipe Transitions From The Metal Pipe, L = 6 M, 4, Total 24 M)
|