Identification And Delimitation Of The Georeferenced Nucleus Perimeter, Reurb Establishment Following The Criteria Of Law 13.465/2017 And Decree, Public Hearing With The Community, Plant Perimeter Containing The Possible Owners And Searches In The Real Estate Registry Office To Identify Owners And, 10/04/2025, Notification Of Confrontation And Owners Under Law 13.465/2017, Prevention Administrative Resolution Of Conflicts To Sanate Any Opposition, Georeferenced Planialtimetric Survey Of The Area., Preliminary Study Of The Uncomfortable, Urbanistic, Socioeconomic Registration, Urban Project According To Article 36 Of Federal Law 13.465/2018 And Article 31, Descriptive Memorial And Art Or Rrt Signed By Legally Qualified, Proposed Environmental Issues And Resettlement, Environmental Technical Study, For The Purposes Provided For In Federal Law 13.465/2017, Physical Schedule Of Services And Implementation Of Essential Infrastructure Works, A Commitment To Be Signed By The Public Or Private, Simplified Planialtimetric Survey, Simplified Urban Project, Simplified Description Memorial, Process Sanitation, Approval Of The Prf By The Prf. Competent Authority, According To Law No. 13.465/2017., Crf Expedition By The Municipality, Request With The Crf Registry Office And The Regularization Project, Monitoring Of The Registration Protocol And Correction Of Possible Returns, Lawyer, Complementary Charges, Social Assistant, Engineer, Engineer, Engineer/Architect, Special Consultant, Consultant Level, Supervisor, Daily Travel. Ogges, Including Food, Administrative Assistant, Designer, Topographer, 53 Kw Light Vehicle, Intercity Displacement, Step I - Mobilization And Information Of Families, With Preliminary Services, Step Ii - Services For The Elaboration Of Technical Studies Necessary For The Elaboration, Step Iii - Project Of Land Regularization, Pursuant To Arts. 35 And 36, Step Iv - Registration Of The Land Regularization Project And Opening Of The Planialtimetric And Cadastral Survey, Budget Spreadsheet For New Constructions, Budget Worksheet For Infrastructure Works, Project Compatibility, Executive Project Of Rain Drainage, Mobilization And Demobilization Of Percussion Percussion Equipment, Percussion Percussion Probing (Spt), Diameter 2.1/2, Executive Concrete Structure Project, Drinking Water Supply System Project, Sewage Collection And Treatment System Project, Electric Network Extension Project, Paving Project, Urban Signalization Project, Structural Concrete Containment Project, Sanitary Landfill Project, School Type Public Equipment Project (Architectural, Structural, Public Equipment Type (Architectural, Hydraulic, Public Equipment Project Leisure (Architectural, Public Equipment Project Type Sport (Architectural
|