|
Drilling By Transporting The Ground To A Distance Of 10 M, Buldozers Power: 96 (130) Kw (A.G.), Group 2 Group (Cutting Plant), To Add To The Norm Of 01-01-031- 02 During The Next 10 M Transport Of Ground, Installation Of Profiled Temporary Ground Roads In The Zero Level When Work Is Performed, 7.5 M, Rock Categories Of Land: 2 (B = 4.5 M), The Capacity Of The Clique Was Thrown Away By The Opposite Challenger Or Reflect And Draglinic Excavators), Group Of Group: 2 (Opening Of Pressurized Pipeline), Manually Drilling Without Fasteners, Ground Group In Sloped Trenches To 2 M, Group 2 (After Excavator, Throwing The Sides Of The Pipeline After Excavator), Drawing Water Pipelines, Hydraulic Testing, Diameter Of The Pipes: 900 Mm (Unusable D = 920X9 Mm Steel Pipe Demolition), Metal Pipes (By Applying Car Taps): Download, The Transport Capacity Of 15 Tons (Code 400004) (Code 400004) Is The Transportation Of Concrete, Reinforced Concrete Products, Wall And Partitions (Bricks, Blocks, Stones, Pans, Panels), Circular Forest Materials And Saw Materials. Transportation Distance - 5 Km. 1St-Grade Load, Metal Pipes (By Application Of Car Taps): Unloading, Hand Planning Of The Bottom And Slopes Of Ducruged Places, Group Group: 2, Correction Of The Basis Under Pipelines: From Sand, Pipeline From Polyethylene Pipes, Diameter: 900 Mm (Pn16 Application), Putting Parts Of Polyethylene Shape: Curves, Elbows, Short Pipes (Patrubok), Crossings, Polyethylene - Metal Transition D400x426mm (D = 900 Mm, Application), Manually Filling The Trenches, Pits And Holes, Group Of Ground: 2
|