Solar Installation - Technology Park Of The Town Of Šumperk With Microgride Connections. The Šumperk Technology Park Project With Microgride Involvement As Part Of The Wider Energy Strategy Of The City Includes Elements Of Technological Park With Consumption Management In The Form Of Microgride. The Subject Of The Contract Is A Comprehensive Implementation Of The Project Technology Park Of The City Of Šumperk With A Microgride Connection And Includes: Renovation Of The Roof Of Kindergarten Šumavská 1916/15, 787 01 Šumperk As Part Of The Preparation For The Installation Of Pvv Construction Of Utilities And Modernization Of Wiring For Connection Of Elementary Schools Šumavská 2325/21 And Kindergarten Šumavská 1916/15, 787 01 Šumperk Including Public Lighting Divorces (Vo) With Switchboards And Autonbirds Construction Of Pvp On Three Buildings: Elementary School Šumavská 2325/21, 787 01 Šumperk Šumavská 1916/15, 787 01 Šumperk Zš Slumče 2692/38, 787 01 Šumperk Construction New Supply Point And Microgride With The Main Switchboard And Large -Capacity Battery Storage (Bess) Integration And Commissioning Of Energy Management Including Control Software, Measuring And Control Elements To Connect All Elements Of Microgride Partial Fulfillment Of The Order. Implementation Must Not Endanger The Operation Of School Facilities. All Planned Restrictions On The Operation Of The Electric Current Must Be Coordinated With The Contracting Authority And Scheduled For The Operation Of The Kindergarten And School, Ideally During The Period Of Holidays Or Other Operating Breaks. The Project Is Preferably Intended For Implementation With The Support Of The Subsidy Program Of New Renewable Sources In The Energy Sector (Res+) Modf-Res+ No. 4/2024-Modf-Res3-Fv_4 Entitled Pve Of The Town Of Šumperk, But Its Implementation Is Not Dependent On The Subsidy. The Expected, And At The Same Time Installed Power Of The Power Plants Is A Minimum Of 196.2 Kwp In Total, The Battery Accumulation Capacity Is At Least 668.92 Kwh With A Total Deviation Of 5%. The Contract Also Contains Regular Service And Maintenance During The Sustainability Of The Project In Accordance With The Conditions Of The Subsidy Program, Which Is 5 Years From The Submission Of Documents On The End Of The Project For The Final Evaluation Of The Event (Hereinafter Referred To As “Zvo”). The Implementation Also Includes The Connection Of The Completed Work, Including Full Operation And Subsequent Installation Of Energy Management In The Form Of Hardware, Including Control Software And Measuring And Control Elements For Optimizing Energy Production And Consumption At The Installation Sites, According To The Parameters Given In Annex 06_Slouva. The Components Used Must Be In Accordance With The Subsidy Program And Have Certificates That Will Be Confirmed By Accredited Certification Bodies (Accredited Entity According To Šcn En Iso/Iec17065: 2013 Or Entity Recognized Via Iecee, See Www.Iecee.Org/Dyn/Www/F?P=106:41:0. The Certificates Will Be Handed Over After The Work. The Subject Of Performance Is Further Defined By The Document Of The Documents In Annex 04_Proof Documents For Implementation As A Project Documentation, Contract With The Distributor And Other Relevant Documents. The Subject Of The Contract Will Be Implemented Completely To The Extent Of The Applicable Technical Documentation And In Accordance With The Terms Of The Closed
Contact Information
Contact No.
+420 734862225
Email
office@uniconn.cz
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94996322
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.